| Bid Specification Number | Announcement Date | Last Date of Tender Submission | Bid Issuing Authority | Bid Items |
Details/ Download |
|
T.N.No. SE/O/KDP/ Tech/F.DOC/ D.NO1803/11, Dt.20.01.12 |
21-JAN-2011 | 30-JAN-12 |
SUPERINTENDING ENGINEER OPERATION CIRCLE/KADAPA |
the works of Manning of 33/11KV Sub – Stations from 1.02.12
to 31.03.12 in Operation Circle, Kadapa as below in the
Annexure – I |
Download |
|
CGM/PROJECTS/ APSPDCL/SIP-74/2011-12 |
06-JAN-2011 | 31-JAN-2012 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Supply, erection , testing and commissioning of 56Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Kadapa District on Turn-Key basis | Download |
|
CGM/PROJECTS/ APSPDCL/SIP-73/2011-12 |
06-JAN-2011 | 31-JAN-2012 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Supply, erection , testing and commissioning of 55Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Chittoor District on Turn-Key basis | Download |
|
CGM/PROJECTS/ APSPDCL/SIP-72/2011-12 |
06-JAN-2011 | 31-JAN-2012 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Supply, erection , testing and commissioning of 42Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Nellore District on Turn-Key basis | Download |
|
CGM/PROJECTS/ APSPDCL/SIP-71/2011-12 |
06-JAN-2011 | 31-JAN-2012 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Supply, erection , testing and commissioning of 43Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Nellore District on Turn-Key basis | Download |
|
CGM/PROJECTS/ APSPDCL/SIP-70/2011-12 |
06-JAN-2011 | 31-JAN-2012 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Supply, erection , testing and commissioning of 24Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Guntur & Prakasam Districts on Turn-Key basis | Download |
|
CGM/PROJECTS/ APSPDCL/SIP-69/2011-12 |
06-JAN-2011 | 31-JAN-2012 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Supply, erection , testing and commissioning of 53Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Krishna District on Turn-Key basis | Download |
|
CGM/PROJECTS/ APSPDCL/SIP-68/2011-12 |
06-JAN-2011 | 31-JAN-2012 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Supply, erection , testing and commissioning of 54Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Krishna District on Turn-Key basis | Download |
| CGM/PROJECTS/ APSPDCL/CEP-76/ 2011-12 | 03-JAN-2011 | 18-JAN-2012 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection of 100/63/25/16 KVA 3-Phase DTRs and 15KVA single phase DTRs with connected 11KV & LT lines in various sub divisions of Krishna District for electrification of new housing colonies under Indiramma housing programme on semi-turnkey basis | Download |
| CGM/PROJECTS/ APSPDCL/CEP-75/ 2011-12 | 03-JAN-2011 | 18-JAN-2012 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection of 100/63/25/16 KVA 3-Phase DTRs and 15KVA single phase DTRs with connected 11KV & LT lines in various sub divisions of Chittoor District for electrification of new housing colonies under Indiramma housing programme on semi-turnkey basis | Download |
| SPMPT- 79/2011-12 | 28-DEC-2011 | 25-JAN-2012 |
CHIEF GENERAL MANAGER /P&MM APSPDCL/TIRUPATI |
Single Phase Electronic Energy Meters (5-30A) LCD Type
AMENDMENT issued for download Clickhere |
Download |
| SPMPT- 56D/2011-12 | 03-DEC-2011 | 14-DEC-2011 |
CHIEF GENERAL MANAGER /P&MM APSPDCL/TIRUPATI |
Registers & Forms with printing | Download |
| SPMPT- 56C/2011-12 | 03-DEC-2011 | 14-DEC-2011 |
CHIEF GENERAL MANAGER /P&MM APSPDCL/TIRUPATI |
Registers & Forms with printing | Download |
| SPMPT- 56B/2011-12 | 03-DEC-2011 | 14-DEC-2011 |
CHIEF GENERAL MANAGER /P&MM APSPDCL/TIRUPATI |
Registers & Forms with printing | Download |
| SPMPT- 56A/2011-12 | 03-DEC-2011 | 14-DEC-2011 |
CHIEF GENERAL MANAGER /P&MM APSPDCL/TIRUPATI |
Registers & Forms with printing | Download |
| CGM/PROJECTS/ APSPDCL/SIP-67/ 2011-12 | 02-DEC-2011 | 15-DEC-2011 |
CHIEF GENERAL MANAGER /Projects APSPDCL/TIRUPATI |
System Improvement Project works for erection of 1No. 33/11KV Sub-Station & their connected lines at Dandubata in Chirala town and other distribution strengthening works in Chirala, Kandukuru towns in Prakasam district under R-APDRP Part-B funding by PFC/ REC on semi-turnkey basis | Download |
| CGM/PROJECTS/ APSPDCL/SIP-66/ 2011-12 | 02-DEC-2011 | 15-DEC-2011 |
CHIEF GENERAL MANAGER /Projects APSPDCL/TIRUPATI |
System Improvement Project works for erection of 1No. 33/11KV Sub-Station & their connected lines at Machilipatnam (MDO Office) and other distribution strengthening works in Machilipatnam, Jaggaiahpeta towns in Krishna District under R-APDRP Part-B funding by PFC/ REC on semi-turnkey basis | Download |
| CGM/PROJECTS/ APSPDCL/SIP-65/ 2011-12 | 02-DEC-2011 | 15-DEC-2011 |
CHIEF GENERAL MANAGER /Projects APSPDCL/TIRUPATI |
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at Kondlopalli in Rajampet Division of Kadapa District on semi-turnkey basis. | Download |
| CGM/PROJECTS/ APSPDCL/SIP-64/ 2011-12 | 02-DEC-2011 | 15-DEC-2011 |
CHIEF GENERAL MANAGER /Projects APSPDCL/TIRUPATI |
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at Lekkalavaripalli in Mydukur Division in Kadapa District on semi-turnkey basis. | Download |
| CGM/PROJECTS/ APSPDCL/SIP-63/ 2011-12 | 02-DEC-2011 | 15-DEC-2011 |
CHIEF GENERAL MANAGER /Projects APSPDCL/TIRUPATI |
Erection and commissioning of 1 No. 33/11 KV sub station, connected 33 KV & 11 KV lines at P.M.Palle in Chittoor Rurals Division of Chittoor District on semi-turnkey basis | Download |
| CGM/PROJECTS/ APSPDCL/SIP-62/ 2011-12 | 02-DEC-2011 | 15-DEC-2011 |
CHIEF GENERAL MANAGER /Projects APSPDCL/TIRUPATI |
Erection and commissioning of 1 No. 33/11 KV sub station, connected 33 KV & 11 KV lines at Damineedu in Tirupati (Town) Division of Chittoor District on semi-turnkey basis | Download |
| SPMPT-59/10-11 | 20-OCT-2011 | 10-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV/433-250 V 100 KVA oil immersed naturally
cooled three phase 50Hz double wound, outdoor type,
conventional Distribution transformers with CRGO/ Amorphous
core top cover fixed with nut and bolt and neoprene gasket
arrangement with Double Paper covered Aluminium winding,
with 0.025mm Cu diaphragm pressure relief vent generally
conforming to IS-1180/part-I&II of 1979 & IS-2026/1977
latest versions where specified otherwise with first filling
of oil generally as per IS-335/1983 (latest version) and as
per specification. Maximum Losses at 50% Load: 435 W Maximum Losses at 100% Load: 1500 W With BEE 5 star rating specification |
Download |
| SPMPT-57/10-11 | 20-OCT-2011 | 10-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV/root3/250V 15KVA oil immersed naturally
cooled single phase 50 Hz , CSP, Copper wound Distribution
Transformer with CRGO/Amorphous core generally conforming to
IS-2026/1977 (latest version) except where specified
otherwise with first filling of oil generally as per
IS-335/1983 (latest version) and as per specification. Losses : No Load : 40 W (Max.) Full Load : 245 W (Max.) |
Download |
| SPMPT-77/10-11 | 18-OCT-2011 | 16-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Tong Testers (Static) Digital, |
Download |
| SPMPT-76/10-11 | 18-OCT-2011 | 16-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Insulation Testers i) 2.5KV Meggers ii) 1000V Meggers iii) Earth Meggers |
Download |
| SPMPT-65/10-11 | 18-OCT-2011 | 24-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
a)New Insulating Transformer oil manufactured
from indigenous crude base TOBS/TOFS with characteristic
values as Mentioned in Annexure-I, packed in 200/210 litres
capacity in new non-returnable steel drums properly sealed. And/or b)New Insulating Transformer oil manufactured from imported crude base with characteristic values as mentioned in Annexure-I, packed in 200/210 litres Capacity in new non-returnable steel drums Properly sealed. |
Download |
| SPMPT-64/10-11 | 18-OCT-2011 | 24-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
24V/40AH Batteries without chargers | Download |
| SPMPT-63/10-11 | 18-OCT-2011 | 24-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
24V 40AH Batteries with Trickle Charger | Download |
| SPMPT-55/10-11 | 17-OCT-2011 | 19-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
G.I Earth Pipe 40mm internal dia, 3mm pipe thickness and 2.5 meters long of standard quality class-B. The pipe should be provided with 10mm holes in diagonally opposite directions through out the length of the pipe at 150mm intervals center to center. At one end, cast iron cone of 50mm length shall be welded as shown in the sketch. The other end 40x3 mm G.I Flat of 340mm (150+40+150mm) length is to be welded neatly and the welding portion only to be painted to prevent rusting 4 Nos. holes suitable for 12mm bolts shall be drilled in the flat at equal distances and 4 Nos. G.I bolts and nuts of size 50x12mm with 2 Nos. sprint washers for each bolt shall be supplied with each pipe. G.I pipe shall conforming to Class-B and as per IS-1239 as per drawing enclosed (Part-I) 1990 with ISI marking. | Download |
| SPMPT-54/10-11 | 18-OCT-2011 | 19-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
C.I Earth Pipes as per IS-1536/1976 Clause-A, 80mm Bore 2.54 meters long with flange at one end and cone at other end. The flange should be drilled with 4 Nos. 16mm dia holes and pipe body should be provided with 14 Nos. 12mm dia holes at equal distance with bolts and nuts | Download |
| SPMPT-53/10-11 | 18-OCT-2011 | 23-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
LT Single phase 3 wire cross arms made out of
M.S. angle 50x50x6mm with back clamps made out of MS Flat 50
x6mm as per the drawing enclosed and painted with single
coat of best quality red oxide paint (suitable for 8M PSCC
Poles) Weight of the each set : 4.2+0.924=5.124Kgs |
Download |
| SPMPT-52/10-11 | 18-OCT-2011 | 23-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV top fittings with clamps made out of
(ISMC-100) M.S. Channel 100x50mm, M.S. Flat 50x6mm and M.S.
Angle 65x65x6mm suitable for 8.0 M PSCC Poles and for 11KV
Pin insulators as per the drawing enclosed and painted with
a single coat of best quality red oxide paint. Weight of the each set : 4.4Kgs |
Download |
| SPMPT-48/10-11 | 18-OCT-2011 | 23-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV V-cross arms with back clamps suitable
for 9.1M PSCC Poles made out of IS MC-75 M.S. Channel
75x40mm and M.S. Flat 50x6mm as per the drawing enclosed and
painted with single coat of best quality red oxide paint Weight of the each set : 9.0+1.23=10.23Kgs. |
Download |
| SPMPT-49/10-11 | 18-OCT-2011 | 23-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV V Channel cross arms with back clamps
suitable for 8M PSCC Poles made out of IS MC-75 M.S. Channel
75x40mm and M.S. Flat 50x6mm as per the drawing enclosed and
painted with single coat of red oxide paint of best quality Weight of the each set : 9+0.924=9.924Kgs. |
Download |
| SPMPT-47/10-11 | 18-OCT-2011 | 23-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV V Channel cross arms with back clamps
suitable for 8M PSCC Poles made out of IS MC-75 M.S. Channel
75x40mm and M.S. Flat 50x6mm as per the drawing enclosed and
painted with single coat of red oxide paint of best quality Weight of the each set : 9+0.924=9.924Kgs |
Download |
| SPMPT-58/10-11 | 17-OCT-2011 | 16-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV/433 –250V 25 KVA oil immersed naturally
cooled three phase, 50 Hz double wound, CRGO Core/Amorphous
Aluminum Winding, outdoor type, conventional Distribution
Transformers top cover fixed with nut and bolt and neoprene
gasket continuous arrangement generally conforming to
IS-1180/Part-I&II and IS-2026/1977 latest versions except
where specified otherwise with first filling of oil
generally as per IS-335/1983 (latest version) and as per
specification. Maximum Losses at 50% Load: 210 W Maximum Losses at 100% Load: 695 W With BEE 3 star rating specification
|
Download |
| SPMPT-58A/10-11 | 17-OCT-2011 | 16-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV/433 –250V 25
KVA oil immersed naturally cooled three phase, 50 Hz double
wound, CRGO Core/Amorphous Aluminum Winding, outdoor type,
conventional Distribution Transformers top cover fixed with
nut and bolt and neoprene gasket continuous arrangement
generally conforming to IS-1180/Part-I&II and IS-2026/1977
latest versions except where specified otherwise with first
filling of oil generally as per IS-335/1983 (latest version)
and as per specification.
|
Download |
| SPMPT-75/10-11 | 15-OCT-2011 | 22-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
9KV, 5KA Porcelain Lightning Arrestors ( Line Type) 2000Nos. |
Download |
| SPMPT-73/10-11 | 15-OCT-2011 | 22-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Hardware for LT. Shackle Insulators: Comprising of A pair of
M.S. straps 2 Nos. M.S. Bolts with Hexagonal heads and Nuts
2 Nos. spring washers – Type (1) as per Fig. (3) of
IS-7935-1975 suitable for shackle insulators type (1) of
IS-1445-1977. Hardware and Nuts to be used with the Hardware for LT shackle Insulators shall be as per IS-3063-1972 and IS-1363 of 1967 respectively. The weight of the complete set shall be 510 grams with 25 grams tolerance. (All parts shall be Hot dip galvanized) |
Download |
| SPMPT-72/10-11 | 15-OCT-2011 | 22-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Hardware G.I Pins with spring washers and Nuts for LT Pin Insulators : Conforming to IS1363-Part-1967 and as per IS-3063-1972 (latest version thereof) with dimensions as per Fig. 2 of ISS-17935/1975 The shank length shall be 125mm Minimum failing load 2KN weight- 400gms | Download |
| SPMPT-71/10-11 | 15-OCT-2011 | 17-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
H.T Guy Insulators conforming to figure – 3 designation 3 in Table – 1 of IS 5300/1969 or the latest version. | Download |
| SPMPT-70/10-11 | 15-OCT-2011 | 17-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV Solid core insulators with top and bottom metal fittings with 26mm threading and generally as per designation C6-75 (vide table No. 1 of IS-5350 part-II/1973) but conforming to the drawing enclosed and IS-2544/1973 in all respects suitable for 11KV 200Amps (tilting type) AB switches with minimum failing load of 6000N in upright bending test. The creepage distance shall not be less than 230 mm. | Download |
| SPMPT- 69/10-11 | 15-OCT-2011 | 17-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
11KV Post type insulators of designation PA 75 (vide test of IS-5350 part-III/1971 and IS-2544/1973 (the latest issue thereof) in all respects and suitable for 11KV 400A & 800A (conventional type) AB switches with minimum failing load of 5000 N in upright bending test, 3000N in inverted bending test, 15000 N in tension, 200N-in torsion and 3000 N in compression. The creepage distance shall the 200mm | Download |
| SPMPT- 67/10-11 | 15-OCT-2011 | 11-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Single Core 1100 V Grade Weather Proof PVC Insulated and PVC Sheathed Aluminium Cables for Outdoor Service Connection Manufactured as per IS:1554 (Part-I)/ 1976, IS:8130/1984 and IS:5831/ 1984 for 150Sqmm | Download |
| SPMPT- 66/10-11 | 15-OCT-2011 | 11-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Single Core 1100 V Grade Weather Proof PVC Insulated and PVC Sheathed Aluminium Cables for Outdoor Service Connection Manufactured as per IS:1554 (Part-I)/ 1976, IS:8130/1984 and IS:5831/ 1984 for 120Sqmm | Download |
| SPMPT-78/ 2011-12 | 15-OCT-2011 | 15-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Audit for IT Systems & Infrastructure, related softwares for APSPDCL | Download |
| SPWT NO .21 /2011-12 | 13-OCT-2011 | 25-OCT-2011 |
CHIEF GENERAL MANAGER /OPN APSPDCL/TIRUPATI |
Construction of Training Centre Building in the premises of Vidyuth Bhavan, Nellore in Nellore Circle.
|
Download |
| SPWT NO .22 /2011-12 | 13-OCT-2011 | 25-OCT-2011 |
CHIEF GENERAL MANAGER /OPN APSPDCL/TIRUPATI |
Construction of Office Complex Building for Division Office, ERO, Sub-Division and Section Offices at Rajampet in kadapa Circle. | Download |
| SPMPT-74/ 2011-12 | 10-OCT-2011 | 09-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Porcelain L.T Shackle insulators (brown glazed) size 90X75 mm for use in L.T.lines below 1000 volts fully conforming to IS:1445 – 1977(with the latest amendments) | Download |
| SPMPT-68/ 2011-12 | 10-OCT-2011 | 24-OCT-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
55Sq.mm Nominal Aluminium area 7/3.15mm Aluminium Alloy Standard Conductor, conforming to REC specification 33/84 (R-1991) and IS-398 Part-IV 1994 with latest amendments thereof | Download |
| SPMPT-62/ 2011-12 | 10-OCT-2011 | 24-OCT-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Super enameled with Terephathalate polyester
base round copper wires (with thick covering) conforming to
IS-4800 (Part-V) 1968 and IS-4800 (Part-III) 1968 suitable
for winding of various capacities of Distribution
transformers 1) SE Copper Winding Wire 25SWG |
Download |
| SPMPT-61/ 2011-12 | 10-OCT-2011 | 24-OCT-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
0.7MM/22SWG Super enameled with Terephathalate polyester base round copper wires (with thick covering) conforming to IS-4800 (Part-V) 1968 and IS-4800 (Part-III) 1968 suitable for winding of various capacities of Distribution transformers | Download |
| SPMPT-60/ 2011-12 | 10-OCT-2011 | 24-OCT-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
1.6mm Double paper covered round aluminium wires REC grade conforming to IS:6162 (Part-I) 1971 with its latest version suitable for windings of Distribution Transformers | Download |
| SPMPT-51/ 2011-12 | 10-OCT-2011 | 11-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
ISLC 75 M.S. Channel 75X40mm confirming to
IS2062 grade A (with latest amendment if any) (Weight per Meter 5.7Kgs & Sectional area 7.26Sq.cm) |
Download |
| SPMPT-50/ 2011-12 | 10-OCT-2011 | 11-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
ISLC 100 M.S. Channel 100X50mm Confirming to IS 2062 grade A ( with latest amendment if any) (Weight per Meter 7.9Kgs & Sectional area 10.02Sq.cm) |
Download |
| SPMPT-46/ 2011-12 | 10-OCT-2011 | 09-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
G.I. Wire 4.0mm (8SWG) as per ISS 280/1978
AMENDMENT issued for download Clickhere AMENDMENT issued for download Clickhere |
Download |
| SPMPT-45/ 2011-12 | 10-OCT-2011 | 09-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
7/2.5mm(7/12SWG)Galvanized Steel Wire as per
IS 2141-1979 or the latest issue (70 Kgf/Sq.mm Quality) with
Galvanization confirming to IS-4826/79 (latest version) |
Download |
| SPMPT-44/ 2011-12 | 10-OCT-2011 | 09-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
7/3.15 mm (7/10SWG Galvanized Steel Wire as per IS 2141-1979 or the latest issue (70Kgf/Sq.mm Quality) with Galvanization confirming to IS-4826/79 (latest version) |
Download |
| SPMPT-43/ 2011-12 | 10-OCT-2011 | 11-NOV-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
R.S. Joists of size 175x85mm(11Mtrs.Long) as per IS:2062 Grade ‘A’
AMENDMENT issued for download Clickhere |
Download |
| SPMPT-42 / 2011-12 | 24-SEP-2011 | 14-OCT-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Comprehensive Annual Maintenance Contract for Servers, Desktops & Printers for entire Discom | Download |
| SPMPT-41/2011-12 | 20-SEP-2011 | 11-OCT-2011 |
CHIEF GENERAL MANAGER (P&MM) APSPDCL/TIRUPATI |
Supply and installation of additional SAN storage for SAP & Billing server at Corporate Office/ Tirupati
* General Terms & Conditions... Clickhere |
Download |
| CGM/PROJECTS/ APSPDCL/ DC-56/ 2011-12 | 02-SEP-2011 | 27-SEP-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Supply, erection and commissioning of street
lights (S.V.Lamps) with infrastructure in all habitations of
all the Grampanchayats of all the six mandals in Pileru
assembly constituency in Chittoor District on Turn-Key
basis. |
Download |
| SPWT-9/11-12 | 18-JUL-2011 | 28-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Construction of Division Office , ERO & Sub-DivisionOffice building at Kandukur in Ongole Circle.
|
Download |
| SPMPT-11/11-12 | 18-JUL-2011 | 28-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 9.10M/280Kgs PSCC poles to Vijayawada Circle | Download |
| SPMPT-10/11-12 | 18-JUL-2011 | 28-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 8.0M/200Kgs PSCC poles to Vijayawada Circle | Download |
| SPMPT-19/11-12 | 18-JUL-2011 | 01-AUG-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 8.0M/140Kgs PSCC poles to Tirupati
Circle |
Download |
| SPMPT-16/11-12 | 18-JUL-2011 | 30-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 9.10M/280Kgs PSCC poles to Ongole Circle | Download |
| SPMPT-15/11-12 | 18-JUL-2011 | 30-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 8.0M/140Kgs PSCC poles to Ongole Circle | Download |
| SPMPT-14/11-12 | 18-JUL-2011 | 30-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 8.0M/200Kgs PSCC poles to Ongole Circle | Download |
| SPMPT-18/11-12 | 18-JUL-2011 | 01-AUG-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 9.10M/280Kgs PSCC poles to Nellore Circle | Download |
| SPMPT-17/11-12 | 18-JUL-2011 | 01-AUG-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 8.0M/200Kgs PSCC poles to Nellore Circle | Download |
| SPMPT-20/11-12 | 18-JUL-2011 | 01-AUG-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 8.0M/140Kgs PSCC poles to Kadapa Circle | Download |
| SPMPT-13/11-12 | 18-JUL-2011 | 29-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 9.10M/280Kgs PSCC poles to Guntur Circle | Download |
| SPMPT-12/11-12 | 18-JUL-2011 | 29-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Manufacture & Supply of 8.0M/200Kgs PSCC poles to Guntur Circle | Download |
| SPMPT-22/11-12 | 14-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
H.V. BRASS BUSHING RODS FOR DTRS
|
Download |
| SPMPT-21/11-12 | 14-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
LV Brass Bushing Rods suitable for conventional type
Distribution Transformers with 12mm dia ,180mm length Brass
rods having threads up to 50 mm on either side with 4 nuts ,
6mm thick one Brass Gland 42mm outer dia , 4mm thick two top
end washers 32mm dia , 4mm thick and one rubber oil seal
complete |
Download |
| SPMPT-20/11-12 | 14-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
LV Brass Bushing Rods suitable for CSP type Distribution Transformers with 12mm dia and 160mm length, threading up to 25mm length on one side and 65mm length on other side with 3 Nos., Hexagonal brass nuts of dia 8/6 mm with one No. Brass Gland of thickness 14mm and of 25mm dia with 2 rubber oil seals and one brass washer of 4mm thick and 32mm dia complete.
|
Download |
| SPMPT-19/11-12 | 14-JUL-2011 | 08-AUG-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
H.T. & L.T. Bi-Metallic Terminal Connectors suitable for
Distribution Transformers as per the relevant ISI with
latest amendments. |
Download |
| SIP-55/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Mydukur-II Division in Kadapa District (33/11KV Sub-Stations viz., Annavaram, Duvvuru & Mydukuru) | Download |
| SIP-54/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Mydukur-I Division in Kadapa District (33/11KV Sub-Stations viz., Porumamilla, Kalavakatta, AKR Palli, Tekurupeta, B.Koduru, Payalakunta, Narasapuram, Varikuntla, K.N.Kottala, Kalasapadu, Y.Ramapuram, Amagampalli, B.Mattam, T.C.Palli, D.Agarharam, Konduru, Badvel, Venkatasettypalli, P.P.Kunta & Ganugapenta) | Download |
| SIP-53/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Rajampeta-VI Division in Kadapa District (33/11KV Sub-Stations viz., Rajampeta, Bramhanpalli, Akepadu, Vathalur, Bavikadpalli, Reddipalli, P.V.Palli, Bestapalli, Penagaluru, Konduru, T.G.Palli, P.G.V.Palli, V.R.Palli, Koduru SS, Jangitivaripalli, Nagavaram, Kadiyalapalli, Koralakunta, Y.Kota, Gadela, V.P.R.KANDRIGA, Settigunta, Vontimitta, Mantapampalli, Limgampalli & Nandaluru) | Download |
| SIP-52/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Proddatur-IV Division in Kadapa District (33/11KV Sub-Stations viz., JAMMALAMADUGU, Ambavaram, T.Chowduru, Dhanavulapadu, Thallaproddatur, V.Koduru, Kondapuram, Pottipadu, Burujupalli, Muddanur, Mangapatnam, Torrivemula, Thala Manchipatnam, Dodium, Gundlakunta, Nemalla Dinne, D.Kalvatala, Uppaluru, Chilamakuru, Malepadu, China Danduluru, Kamalapuram, Pandhillapalli, Induluru, G.N.Palli, Valluru, Proddatur Town, Rajupalem, Vellala, Proddatur Rural & Kamanuru) | Download |
| SIP-51/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Pulivendula-II Division in Kadapa District (33/11KV Sub-Stations viz., Velidandla, Parnapalli, M. Chintala, Chinna Kudala, Hirojipuram, Bonala, Lingala, Pulivendula, N.R. Palli, J.R.Palli, Ravulakolanu & S.Puram) | Download |
| SIP-50/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Tirupati town & rural-IV Division in Chittoor District (33/11KV Sub-Stations viz., Pakala, Damalacheruvu, Agarala, Gangudupalli, Rangampeta, Achamma Agraharam, Vallivedu, Mangalampeta, Guravarajupalli, Maddinaynipalli & Panabakam) | Download |
| SIP-49/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Puttur-V Division in Chittoor District (33/11KV Sub-Stations viz., Katikapalle, Chinnathayyur, SR Puram, E.Kuppam, M Kothur, Nagari, 132KV SS Puttur, Vadamalapeta, Vijaya Puram, Netteri, A.P.Gunta, V.Kuppam, Nagalapuram & Chinnapandur) | Download |
| SIP-48/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Piler Division in Chittoor District (33/11KV Sub-Stations viz., Garnimitta, Piler, Gyarampalli, Nutanakalava, Medikurthi, Vayalpad, Talapula, Sivaramapuram, Guttapalem, Chinthaparthi, Cherlopalli, Kalakada, Kalikiri, Errakotapalli, Pallavolu, Amilepalli, Nagarimadugu, Gurramkonda & Kadirayacheruvu) | Download |
| SIP-47/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Chittoor-VI Division in Chittoor District (33/11KV Sub-Stations viz., Kattakindapalli, Uppuvanka, Avalakonda & Polakala) | Download |
| SIP-46/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Madanapalle-V Division in Chittoor District (33/11KV Sub-Stations viz., Mulakalacheruvu, Mallela, Varikasuvupalli, B.Kothakota, V.R. Agraharam, Kandukuru, Bommanacheruvu, Kurabalakota, Valasapalli, CTM, PTM SS , Kotavooru, Burakayalakota, Bhakara Peta, V.R.Agraharam, Gopidinne & Kotavuru) | Download |
| SIP-45/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Atmakur Division in Nellore District (33/11KV Sub-Stations viz., D.C.Palli, Kethigunta, Marripadu, Krishnapuram, Chinamachanuru, V.K.Padu, Peddireddypalli & Timmareddypalli) | Download |
| SIP-44/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Kavali Division in Nellore District (33/11KV Sub-Stations viz., Kaligiri, Ayyapareddypalem, Ananthapuram, Jaladanki, Bramhanakraka, Chowdavaram, Vinjamur, Chakalikonda, Gudemadakala, Motuchintalapalem, Kondapuram, Gottigundala, Maddurpadu, PR Nagar, Bogole, Sangam, Siddipuram, Dagadarthi, Ithampadu & Patur) | Download |
| SIP-43/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Naidupeta-I Division in Nellore District (33/11KV Sub-Stations viz., Menakuru, Annamedu, Puduru, Pellakuru, K.G Kandriga, Ozili, Kurugunda, Aaemenipadu, Vajjavaripalem, Mannarpoluru, Dakkili, Mopuru, Daggavolu & Pigilam) | Download |
| SIP-42/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Gudur-I Division in Nellore District (33/11KV Sub-Stations viz., Goginenipuram, Mittatmakuru, Gollapalli, Chinthavaram, Chillakuru, Cherlopalli, Utukuru Sydapuram, Pothegunta, Rapuru, Gonupalli, Chendodu) | Download |
| SIP-41/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Nellore-I Division in Nellore District (33/11KV Sub-Stations viz., 132KV N V Garden, Market Yard, Podalakur, Viruvur, Thatiparthy, P G Patnam, Adurpalli, Chejerla, CH Atmakur & Thurpupalli) | Download |
| SIP-40/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Markapur-II Division in Prakasam District (33/11KV Sub-Stations viz., Yachavaram, Komarolu, Racherla, P.Araveedu, Sanikavaram, B. Cherlopalli , Mekalavaripalli & Mutukula) | Download |
| SIP-39/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Markapur-I Division in Prakasam District (33/11KV Sub-Stations viz., SR Peta, KS Palli, Akkapalli, Pedadornala, Chapalamadugu, Y.Palem, Tripuranthakam & P.Cheruvu) | Download |
| SIP-38/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Kanigiri-II Division in Prakasam District (33/11KV Sub-Stations viz., Darsi, Marripudi, Kanigiri, Pamur, P.Irlapadu & C.S.Puram) | Download |
| SIP-37/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High Voltage Distribution System in Kanigiri-I Division in Prakasam District (33/11KV Sub-Stations viz., Donakonda, Kurichedu, Talluru, Podili, Mundlamur, T.R.Palli & Rallapalli) | Download |
| SIP-36/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into Highvoltage Distribution System in Macherla-I Division in Guntur District (33/11KV Sub-Stations viz., Bellamkonda, Machavaram, Macherla, Gurazala, Durgi, Muthukuru, Koppanuru, Nakarikallu & Atchempet) | Download |
| SIP-35/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into Highvoltage Distribution System in Narasaraopet Division in Guntur District (33/11KV Sub-Stations viz., Enugupalem, Cheekateegalavaripalem, Nuzendla, Remidecherla, Bandalamotu, Gandiganumala, Veellaturu, Pamidipadu, Epuru, Krosuru, Pisapadu, Sattenapalli SS-II, Dullipalla SS-I, arasaraopet, Uuppalapadu & Rompicharla) | Download |
| SIP-34/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into Highvoltage Distribution System in Nuzividu-II Division in Krishna District (33/11KV Sub-Stations viz., Gudipadu, Agiripalli, A.Nekkalem, Nandamuru, Telaprolu, Veeravalli & Pallerlamudi) | Download |
| SIP-33/ 2011-12 | 05-JUL-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Conversion of LT Network into High voltage Distribution System in Nuzividu-I Division in Krishna District (33/11KV Sub-Stations viz., Musunuru, Venkatapuram, Nuzvid, Katrenipadu, Annavaram & Vattigudipadu) | Download |
| SIP-32/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at Nerabylu (V) in Y.V.Palem Mandal in Piler Operation Division in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-31/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at Paturu in Rajampeta Operation Division in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-30/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at 132KV SS compound (Puttur) in Puttur Operation Division and 33KV interlinking lines from 132KV SS Somala in Piler Operation Division in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-29/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 1No. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Venkateswarapuram in Nellore Operation Division in Nellore District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-24/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 3Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Sanipaya, Settipalli, Konampeta in Rayachoti Operation Division in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-23/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 3Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Govt.Hospital (Pulivendula), Peddajuturu, Mabbuchinthalapalli in Pulivendula Operation Division in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-22/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 3Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Ayyavaripalli, Naganurupalli, Buduguntapalli in Mydukur, Proddatur & Rajampeta Operation Divisions in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-21/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 3Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at T.Kammapalli, Rollamadugu, Mannur in Rajampeta Operation Division in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-20/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 4 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Madapur, Telugu Ganga Colony (Mydukuru), Adi Reddy Palli, Uppagunta palli in Mydukur Operation Division in Kadapa District on turnkey basis (excluding 100Sqmm Conductor) | Download |
| SIP-19/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 3 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Gorlapalli, Katimayakunta, Boreddyvaripalli in Kadapa & Rayachoti Operation Divisions in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-18/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 3 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at A.Buduguru, C.Baladar, MNR Palli in Kuppam & Chittoor Rural Operation Divisions in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-17/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 2 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Palem, ITI College(Piler) in Piler Operation Division in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-16/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 2 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Kollagunta, Kothakota in Puttur & Chittoor town Operation Divisions in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-10/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 4 Nos. 33/11 KV Sub- Stations, connected 33 KV & 11 KV lines at Padarupalli, Narayanareddypeta, N.M. Kandriga & Vanamthopu in Nellore District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-09/ 2011-12 | 29-JUN-2011 | 14-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 2 Nos. 33/11 KV sub stations, connected 33 KV & 11 KV lines at Kothuru & Guntupalli in Kanigiri Operation Division in Prakasam District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-08/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 2 Nos. 33/11 KV sub stations, connected 33 KV & 11 KV lines at Oguru & Chinalatripi in Kandukuru Operation Division in Prakasam District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-06/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 3 Nos. 33/11 KV sub stations, connected 33 KV & 11 KV lines at Anumalaveedu, Rajupalem & Nagulavaram in Markapur Operation Division in Prakasam District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SIP-03/ 2011-12 | 29-JUN-2011 | 20-JUL-2011 |
CHIEF GENERAL MANAGER /PROJECTS APSPDCL/TIRUPATI |
Erection and commissioning of 2 Nos. 33/11 KV sub stations, connected 33 KV & 11 KV lines at Julakallu & Pulipadu in Macherla Operation Division in Guntur District on turnkey basis (excluding 100 Sqmm Conductor) | Download |
| SPMPT-39/11-12 | 25-JUN-2011 | 18-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV Solid core insulators for Three Phase 11KV H.G. Fuse
Sets conform in all respects to IS 5350 and
IS-731/1971(Latest Version) |
Download |
| SPMPT-38/11-12 | 25-JUN-2011 | 18-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Hardware fittings for 11KV string insulators conforming to
IS 2486 (the latest version) C&T Type consisting of a) One set of cross straps suitable for 100X50mm channel cross arms as per fig. 26 of IS 2486 part-II-1974 and the dimensions of bolts head, nut and spring washer shall be as per IS 1363-1967 and IS 3063 – 1972 respectively. b) One Tension clamp complete with clevis, flat washer 2.5mm split pin brass 4mm, 16mm rivet, keeper U bolt 10mm nut 8mm. And spring washer 2.5mm etc. All sundry items to make complete fittings should be included. The clamps should of aluminium alloy. The clamps should be suitable for fixing (34 Sq.mm & 55 Sq.mm AAA Conductor) |
Download |
| SPMPT-37/11-12 | 25-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV G.I Pins: Hardware G.I Pins with spring washers and
nuts for 11KV Pin Insulators: Conforming to IS
2486-Part-I-1971 and IS –2486-Part-II-1989 (Latest versions
thereof) with dimensions as per Fig. (5) S165P of
IS-2486-Part-II-1989 with specifications confirming to S165P
. The shank length shall be 150 mm. Minimum failing load
5KN. |
Download |
| SPMPT-36/11-12 | 25-JUN-2011 | 18-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV 45 KN composite polymer insulators suitable to C&T
clamps as per IEC Specification No. IEC 61109 and as per
relevant IS. |
Download |
| SPMPT-35/11-12 | 25-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV Pin insulators (Porcelain) conforming to IS:731-1971
(the latest issues) with minimum failing load of 5KN and to
suit the insulator pins conforming to fig. 5 ref. 5165P of
IS:2486 - part-II-1974. The creepage distance shall be 230mm
minimum. |
Download |
| SPMPT-34/11-12 | 25-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Metallic parts for 11KV 3f
HG fuse sets complete comprising arcing horns, insulator
supports, MS mounting suitable for single pole structure
with required bolts and nuts along with 12KV solid core
insulators for the above HG fuse sets ie., 3 Nos. per set
with bird fault proof arrangement confirming to the
technical particulars as per technical inspection. |
Download |
| SPMPT-33/11-12 | 25-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
34Sqmm AAA Conductor specifies 34Sq.mm Nominal Aluminium
area 7/2.50mm Aluminium Alloy Stranded Conductor, conforming
to REC specification 33/84 (R-1991) and IS-398 Part-IV 1994
with latest amendments thereof |
Download |
| SPMPT-32/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11 KV 3C x 35 Sq. mm Heat shrinkable end termination cable
jointing kits (Out door type) suitable for XLPE UG cable
with ISI mark |
Download |
| SPMPT-31/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Unarmoured PVC insulated and PVC sheathed 1100 Volts grade
cables with stranded conductors of annealed high
conductivity copper conforming to IS:1554 and IEC 228 of
size.
|
Download |
| SPMPT-30/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
L.T. AERIAL BUNCHED CABLES : HDPE insulated aluminium cable twisted over a central bare aluminium alloy messenger wire for use on L.T. overhead lines conforming to IS 8130/1984, IS 6474/1984 and IS : 398 (iv) 1994 of the following size with latest amendment thereof a) 2C X 16 + 25 Sq.mm |
Download |
| SPMPT-29/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Nylon Bush suitable for Moving Insulator arrangement of 11KV
200A Tilting Type AB Switches 1st AMENDMENT issued for download Clickhere |
Download |
| SPMPT-28/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Moving contact for 11KV 200A (16 KA Load Break) T.T. type
AB.Switch consisting of Jaw cup of 220x70x2 mm with jumper
pad of HDEC 30x6x100mm and Arcing horn of 5mm dia St.Steel
rod to fix in jaw cup with studs and nuts and with St.Steel
springs ( 2 Nos.). |
Download |
| SPMPT-27/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Moving contact HDEC(nife) electroplated with swivelling
plate (HDEC), Arcing Horn 6mm dia MSHDG and Copper flexible
jumper with required bolts & nuts for 11KV 200 A (Conv.)
AB.Switch. Nife size 32x5x320mm, swivelling plate size
32x5x145mm and One No.Flexible Jumper of Size 25x3x360mm. |
Download |
| SPMPT-26/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Fixed Contacts consisting of 2 Nos. Self released Jaws type
fixed contact 25x4x75mm Copper Strip tin plated suitable for
11KV 400A (Conv.) AB.Switches with 10 Nos. Cu Strips for
each jaw (The contacts designed to carry current with
current density 2A/Sq.mm and while carrying the rated
continuous current the temp. rise does not increase beyond
the value specified in IS i.e., 40 Degree C above ambient)
and 2 sets of ST.Steel ( Non - Magnetic) springs each
provided on either side of fixed contact blades so that
smooth contact is made for making and breaking contact and
MSHDG top and bottom housing, arcing horn of 6mm dia MSHDG
with required bolts and nuts with jumper pad of size
32x6.5x200mm. |
Download |
| SPMPT-25/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Fixed Contacts suitable for 11KV 200A (T.T) A.B.Switches
shall be of high grade copper and capable of carrying the
short circuit current of 16 KA (Min.) and capable of
carrying rated normal current of the switch continuously the
contact shall be 30x6x225 mm copper flat nickle plated and
with 14 SWG gauge Phospher bronze arcing horn suitable for
the above switch. |
Download |
| SPMPT-24/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV 200A Load Break outdoor tilting type triple pole gang
operated vertical mounted AB Switch with all accessories,
solid core insulators and Brass Bush instead of Nylon Bush
for assembly and operation with the following coordinated
ratings conforming to REC specification No. 43 of 1987 and
as per IS 1818/1972, IS 9920 parts I to IV (Latest version)
and IS 9921 parts I to IV (Latest version). The solid core
insulators shall be in accordance with IS:2544/1973 and IS
5350 (Part-II) of 1973 or the latest issue. |
Download |
| SPMPT-23/11-12 | 25-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV 200 Amps conventional AB Switches with post type
insulators complete, outdoor type manually operated triple
pole gang operated rotating type single break horizontally
mounted isolators switch portion complete in all respects
with locking arrangements both in OFF and ON position as per
IS 1818/1972, IS 9920/parts I to IV (latest version) and IS
9921 part I to IV (latest versions) with one set of six
rigid bimetallic connectors suitable for ACSR/AAAC conductor
size 55/34Sqmm with post type insulators. The switch portion
with the above description shall be supplied with lock and
keys of standard make, 3 fixing guides and earth terminal
with clamping bolt of 12mm. Dia for each phase marked with
earth symbol and shall be with all accessories as per clause
(6) & (7) of section- IV for assembly and operation and
shall be with the following co-ordinated ratings. a) Rated Voltage : 12 KV b) Rated Current : 200 A c) Rated short time Current : 16KA/1 Sec. d) Rated peak short circuit current : 40KA (Peak) |
Download |
| SPMPT-18/11-12 | 23-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV/433-250 V 315KVA oil immersed naturally
cooled three phase 50Hz Outdoor type CSP Distribution
Transformer, CRGO/ Amorphous, top cover fixed with nut and
bolt and neoprene gasket arrangement with double paper
covered copper wound winding with U shaped pressure relief
vent of 0.025 Copper diaphragm generally conforming to IS
1180/Part I & II of 1979 and IS -2026/1977 latest versions
except where specified otherwise with firms filling of oil
generally as per IS-355/1983 (latest version ) and as per
specification Guaranteed Max Lossess : No Load : 680W(Max) - for CRGO Core 185W (Max) - for Amorphous Full Load : 3500 W (Max.) |
Download |
| SPMPT-17/11-12 | 23-JUN-2011 | 25-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
3Ø 40 KVA CRGO core Conventional type copper wound
Distribution Transformers generally conforming to
IS-1180(part-I) with latest versions except where specified
otherwise with first filling of oil generally as per IS-335/
1993 (latest version) and as per specification Maximum Losses at 50% Load: 277 W Maximum Losses at 100% Load: 914 W With BEE 3 star rating specification |
Download |
| SPMPT –02/11-12 | 01-JUN-2011 | 06-JUN-2011 | CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI |
Manufacture & Supply of 9.10M/280Kg PSCC
Poles to Guntur Circle |
Download |
| SPMPT –03/11-12 | 01-JUN-2011 | 06-JUN-2011 | CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI |
Manufacture & Supply of 8.0M/200Kg PSCC Poles
to Nellore Circle |
Download |
| SPMPT –04/11-12 | 01-JUN-2011 | 07-JUN-2011 | CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI |
Manufacture & Supply of 9.10M/280Kg PSCC
Poles to Tirupati Circle |
Download |
| SPMPT –08/11-12 | 04-JUN-2011 | 08-JUN-2011 | CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI |
Manufacture & Supply of 12.5M/350 Kg Spun
Poles to all circles of APSPDCL |
Download |
| SPMPT –07/11-12 | 04-JUN-2011 | 08-JUN-2011 | CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI |
Manufacture & Supply of 11.0M/350 Kgs SPUN
Poles to all the Circles in SPDCL. |
Download |
| SPMPT-40/11-12 | 15-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
H.T. Meter Boxes
Amendment issued for downlaod Clickhere |
Download |
| SPMPT-16/11-12 | 15-JUN-2011 | 18-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
M.S. Bolts, Nuts & Washers of various sizes as per IS
1363 with latest amendments 5/8”x 3” ( Full Thread) 100, 5/8”x 4” ( Full Thread) 100, 5/8”x 6” ( Full Thread) 25 |
Download |
| SPMPT-15/11-12 | 15-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
M.S. Flat 50X6mm confirming to IS2062 grade A (with latest
amendment if any) (weight per meter 2.4Kgs |
Download |
| SPMPT-14/11-12 | 15-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
M.S. Flat 75X8mm confirming to IS2062 grade A (with latest
amendment if any) (weight per meter 4.7Kgs) |
Download |
| SPMPT-13/11-12 | 15-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
ISA 50-50 M.S. Angle 50x50x6mm confirming to IS2062 grade A
(with latest amendment if any) 4.5Kg Weight per Mt. &
sectional area 5.68Sq.cm |
Download |
| SPMPT-12/11-12 | 15-JUN-2011 | 11-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
ISA 65-65
|
Download |
| SPMPT-04/11-12 | 13-JUN-2011 | 06-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Registers & Forms | Download |
| SPMPT-05/11-12 | 13-JUN-2011 | 14-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
33KV Outdoor VCBs (Operated on 220Vdc) | Download |
| SPMPT-06/11-12 | 13-JUN-2011 | 15-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
33KV CTs of ratio 150/1 Amp. Class 0.2S accuracy | Download |
| SPMPT-07/11-12 | 13-JUN-2011 | 14-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
33KV/110V Single phase Potential transformers of class 0.2 accuracy |
Download |
| SPMPT-08/11-12 | 13-JUN-2011 | 15-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV CTs of ratio100/1A of class 0.2S accuracy | Download |
| SPMPT-09/11-12 | 13-JUN-2011 | 15-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV CTs of ratio150/1A of class 0.2S accuracy | Download |
| SPMPT-10/11-12 | 13-JUN-2011 | 14-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV 3Phase PTs of Class 0.2 accuracy | Download |
| SPMPT-11/11-12 | 13-JUN-2011 | 15-JUL-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV Metering Sets of ratio 5/5A class 0.5S accuracy (Out Door type) |
Download |
|
|
9-JUN-2011 | 24-JUN-2011 |
CHIEF GENERAL MANAGER /(HRD) APSPDCL/TIRUPATI |
Providing Technical Manpower Services
(TMS) for a period of ONE (1) year at various
locations of SPDCL (Krishna, Guntur, Prakasam, Nellore,
Chittoor and Kadapa districts) Amendment issued for downlaod Clickhere |
Download |
| SPMPT-03/11-12 | 21-MAY-2011 | 26-JUN-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
LT CT Operated Trivector Meters with 4 Nos.
CTs of ratio 125/5A and class 0.5 S accuracy housed in PP
Box Amendment issued for downlaod Clickhere |
Download |
SPMPT- 01/2011-2012 |
06-MAY-2011 | 25-MAY-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Single phase (10-60A) keypad pre payment
meter and vending / transaction service
|
Download |
| SPMPT- 02/2011-2012 | 06-MAY-2011 | 25-MAY-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Three phase(20-80A) keypad pre payment meter and vending / transaction service
|
Download |
| SPWT–13 /10-11 | 02-APR-2011 | 07-APR-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Construction of Division Office Building ,Mydukur in Kadapa
Circle
for download Clickhere |
Download |
| SPMPT–94 /10-11 | 26-MAR-2011 | 18-APR-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV 45 KN composite polymer insulators suitable to C&T clamps as per IEC Specification No. IEC 61109 and as per relevant IS. | Download |
| SPMPT–11 /10-11 | 24-MAR-2011 | 30-MAR-2011 | CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI | Manufacture & Supply of 8.0M/200Kg PSCC Poles to Guntur Circle | Download |
| SPMPT–93 /10-11 | 21-MAR-2011 | 18-APR-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Supply, Erection and Commissioning of 11kv 2 MVAR Capacitor Banks With associated equipments *2nd Amendment issued for downlaod Clickhere
Amendment issued for downlaod Clickhere |
Download |
|
TENDER SPECIFICATION No.2,9,11,13,14, 15,16,17,18,19, 22,23,24,34,35, 37,41,44,45,53,54, 74,75,80,89,90,93, 94,96,100,101,102, 103,104,105,106, 107,108,110,120,122, 123,128,135,137,139, 143,144,145,149,150, 151,152,153, 155/2011-12 |
18-FEB-2011 | 22-MAR-2011 | Superintending Engineer/Operation/ Kadapa |
Carrying out Manning & Maintenance On work contract basis of the specified 33/11KV Sub-stations in Operation circle, Kadapa
for download Clickhere
|
Download |
| SPMPT–91 /10-11 | 14-MAR-2011 | 18-APR-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV/433 – 250V 16KVA oil immersed naturally cooled three
phase, 50 Hz double wound, CRGO/ Amorphous core, Copper
Winding, outdoor type, Conventional Distribution
Transformers top cover fixed with nut and bolt and neoprene
gasket continuous arrangement generally conforming to
IS-1180/Part-I&II and IS-2026/1977 latest versions except
where specified otherwise with first filling of oil
generally as per IS-335/1983 (latest version) and as per
specification. Maximum Losses at 50% Load: 150 W Maximum Losses at 100% Load: 480 W With BEE 3 star rating specification |
Download |
| SPMPT–92 /10-11 | 11-MAR-2011 | 18-APR-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
ISLC 100 M.S. Channel 100X50mm confirming to IS 2062 grade A
( with latest amendment if any) (Weight per Meter 7.9Kgs & Sectional area 10.02Sq.cm) ISLC 75 M.S. Channel 75X40mm confirming to IS2062 grade A (with latest amendment if any) (Weight per Meter 5.7Kgs & Sectional area 7.26Sq.cm) |
Download |
| SPMPT–90 /10-11 | 09-MAR-2011 | 07-APR-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV metering sets of class 0.5S accuracy 10/5A(outdoor type) |
Download |
|
Spec. No. 6,20,21,36,39,42, 53,56,67,74,75, 78,84,98,101, 110 & 114 /10-11 |
02-MAR-2011 | 09-MAR-2011 |
SUPERINTENDING ENGINEER OPERATION CIRCLE/ONGOLE |
Carrying out of Operation & Maintenance of 33/11KV Sub-stations ( including watch & ward ) on work contract basis | Download |
| SIP- 52/2011 | 24-FEB-2011 |
11-MAR-2011 |
Chief General Manager/Projects Coporate office/ Tiurpati |
Building up the infrastructure for the proposed Disaster Recovery Center of APDISCOMS in SPDCL Corporate Office, , Tirupati
for download Clickhere
*Last date for submission of hard copies along with DD/BG towards Bid Security to reach the Employer 21-03-2011 |
Download |
| SPMPT–89 /10-11 | 15-FEB-2011 | 16-MAR-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
11KV/433 – 250V 160 KVA oil immersed naturally cooled three
phase, 50 Hz double wound, CRGO /Amorphous Core Aluminum
Winding, outdoor type, CSP 3-star rated Distribution
Transformers top cover fixed with nut and bolt and neoprene
continuous gasket arrangement generally conforming to
IS-1180/Part-I&II and IS-2026/1977 latest versions except
where specified otherwise with first filling of oil
generally as per IS-335/1983 (latest version)and as per
specification. *Extension issued for downlaod Clickhere |
Download |
| SPMPT–86 /10-11 | 03-FEB-2011 | 05-MAR-2011 |
CHIEF GENERAL MANAGER /(P&MM) APSPDCL/TIRUPATI |
Three Phase (10-60)a LT static whole current Trivector energy meters with backlit LCD display *3nd Amendment issued for downlaod Clickhere 2nd Amendment issued for downlaod Clickhere Amendment issued for downlaod Clickhere TECHNICAL SPECIFICATION AND GUARANTEED TECHNICAL PARTICULARS FOR SINGLE PHASE METERS |