Bid Specification Number Announcement Date Last Date of Tender Submission Bid Issuing Authority Bid Items

Details/

Download

T.N.No. SE/O/KDP/

Tech/F.DOC/

D.NO1803/11, Dt.20.01.12

21-JAN-2011 30-JAN-12 SUPERINTENDING ENGINEER OPERATION CIRCLE/KADAPA
 
the works of Manning of 33/11KV Sub – Stations from 1.02.12 to 31.03.12 in Operation Circle, Kadapa as below in the Annexure – IAMENDMENT  issued for download Clickhere Download

CGM/PROJECTS/

APSPDCL/SIP-74/2011-12

06-JAN-2011 31-JAN-2012

CHIEF GENERAL MANAGER /PROJECTS

APSPDCL/TIRUPATI

Supply, erection , testing and commissioning of 56Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Kadapa District on Turn-Key basis Download

CGM/PROJECTS/

APSPDCL/SIP-73/2011-12

06-JAN-2011 31-JAN-2012

CHIEF GENERAL MANAGER /PROJECTS

APSPDCL/TIRUPATI

Supply, erection , testing and commissioning of 55Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Chittoor District on Turn-Key basis Download

CGM/PROJECTS/

APSPDCL/SIP-72/2011-12

06-JAN-2011 31-JAN-2012

CHIEF GENERAL MANAGER /PROJECTS

APSPDCL/TIRUPATI

Supply, erection , testing and commissioning of 42Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Nellore District on Turn-Key basis Download

CGM/PROJECTS/

APSPDCL/SIP-71/2011-12

06-JAN-2011 31-JAN-2012

CHIEF GENERAL MANAGER /PROJECTS

APSPDCL/TIRUPATI

Supply, erection , testing and commissioning of 43Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Nellore District on Turn-Key basis Download

CGM/PROJECTS/

APSPDCL/SIP-70/2011-12

06-JAN-2011 31-JAN-2012

CHIEF GENERAL MANAGER /PROJECTS

APSPDCL/TIRUPATI

Supply, erection , testing and commissioning of 24Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Guntur & Prakasam Districts on Turn-Key basis Download

CGM/PROJECTS/

APSPDCL/SIP-69/2011-12

06-JAN-2011 31-JAN-2012

CHIEF GENERAL MANAGER /PROJECTS

APSPDCL/TIRUPATI

Supply, erection , testing and commissioning of 53Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Krishna District on Turn-Key basis Download

CGM/PROJECTS/

APSPDCL/SIP-68/2011-12

06-JAN-2011 31-JAN-2012

CHIEF GENERAL MANAGER /PROJECTS

APSPDCL/TIRUPATI

Supply, erection , testing and commissioning of 54Nos. of 11KV 2MVAR Capacitor Banks with associated equipments at various existing 33/11KV Sub-Stations under REC scheme (P:SI Distribution) in Krishna District on Turn-Key basis Download
CGM/PROJECTS/ APSPDCL/CEP-76/ 2011-12 03-JAN-2011 18-JAN-2012

CHIEF GENERAL MANAGER /PROJECTS

APSPDCL/TIRUPATI

Erection of 100/63/25/16 KVA 3-Phase DTRs and 15KVA single phase DTRs with connected 11KV & LT lines in various sub divisions of Krishna District for electrification of new housing colonies under Indiramma housing programme on semi-turnkey basis Download
CGM/PROJECTS/ APSPDCL/CEP-75/ 2011-12 03-JAN-2011 18-JAN-2012

CHIEF GENERAL MANAGER /PROJECTS

APSPDCL/TIRUPATI

Erection of 100/63/25/16 KVA 3-Phase DTRs and 15KVA single phase DTRs with connected 11KV & LT lines in various sub divisions of Chittoor District for electrification of new housing colonies under Indiramma housing programme on semi-turnkey basis Download
SPMPT- 79/2011-12 28-DEC-2011 25-JAN-2012 CHIEF GENERAL MANAGER /P&MM
APSPDCL/TIRUPATI
Single Phase Electronic Energy Meters (5-30A) LCD Type

2nd AMENDMENT  issued for download Clickhere

AMENDMENT  issued for download Clickhere

Download
SPMPT- 56D/2011-12 03-DEC-2011 14-DEC-2011 CHIEF GENERAL MANAGER /P&MM
APSPDCL/TIRUPATI
Registers & Forms with printing Download
SPMPT- 56C/2011-12 03-DEC-2011 14-DEC-2011 CHIEF GENERAL MANAGER /P&MM
APSPDCL/TIRUPATI
Registers & Forms with printing Download
SPMPT- 56B/2011-12 03-DEC-2011 14-DEC-2011 CHIEF GENERAL MANAGER /P&MM
APSPDCL/TIRUPATI
Registers & Forms with printing Download
SPMPT- 56A/2011-12 03-DEC-2011 14-DEC-2011 CHIEF GENERAL MANAGER /P&MM
APSPDCL/TIRUPATI
Registers & Forms with printing Download
CGM/PROJECTS/ APSPDCL/SIP-67/ 2011-12 02-DEC-2011 15-DEC-2011 CHIEF GENERAL MANAGER /Projects
APSPDCL/TIRUPATI
System Improvement Project works for erection of 1No. 33/11KV Sub-Station & their connected lines at Dandubata in Chirala town and other distribution strengthening works in Chirala, Kandukuru towns in Prakasam district under R-APDRP Part-B funding by PFC/ REC on semi-turnkey basis Download
CGM/PROJECTS/ APSPDCL/SIP-66/ 2011-12 02-DEC-2011 15-DEC-2011 CHIEF GENERAL MANAGER /Projects
APSPDCL/TIRUPATI
System Improvement Project works for erection of 1No. 33/11KV Sub-Station & their connected lines at Machilipatnam (MDO Office) and other distribution strengthening works in Machilipatnam, Jaggaiahpeta towns in Krishna District under R-APDRP Part-B funding by PFC/ REC on semi-turnkey basis Download
CGM/PROJECTS/ APSPDCL/SIP-65/ 2011-12 02-DEC-2011 15-DEC-2011 CHIEF GENERAL MANAGER /Projects
APSPDCL/TIRUPATI
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at Kondlopalli in Rajampet Division of Kadapa District on semi-turnkey basis. Download
CGM/PROJECTS/ APSPDCL/SIP-64/ 2011-12 02-DEC-2011 15-DEC-2011 CHIEF GENERAL MANAGER /Projects
APSPDCL/TIRUPATI
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at Lekkalavaripalli in Mydukur Division in Kadapa District on semi-turnkey basis. Download
CGM/PROJECTS/ APSPDCL/SIP-63/ 2011-12 02-DEC-2011 15-DEC-2011 CHIEF GENERAL MANAGER /Projects
APSPDCL/TIRUPATI
Erection and commissioning of 1 No. 33/11 KV sub station, connected 33 KV & 11 KV lines at P.M.Palle in Chittoor Rurals Division of Chittoor District on semi-turnkey basis Download
CGM/PROJECTS/ APSPDCL/SIP-62/ 2011-12 02-DEC-2011 15-DEC-2011 CHIEF GENERAL MANAGER /Projects
APSPDCL/TIRUPATI
Erection and commissioning of 1 No. 33/11 KV sub station, connected 33 KV & 11 KV lines at Damineedu in Tirupati (Town) Division of Chittoor District on semi-turnkey basis Download
SPMPT-59/10-11 20-OCT-2011 10-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
11KV/433-250 V 100 KVA oil immersed naturally cooled three phase 50Hz double wound, outdoor type, conventional Distribution transformers with CRGO/ Amorphous core top cover fixed with nut and bolt and neoprene gasket arrangement with Double Paper covered Aluminium winding, with 0.025mm Cu diaphragm pressure relief vent generally conforming to IS-1180/part-I&II of 1979 & IS-2026/1977 latest versions where specified otherwise with first filling of oil generally as per IS-335/1983 (latest version) and as per specification.
Maximum Losses at 50% Load: 435 W
Maximum Losses at 100% Load: 1500 W
With BEE 5 star rating specification
Download
SPMPT-57/10-11 20-OCT-2011 10-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
11KV/root3/250V 15KVA oil immersed naturally cooled single phase 50 Hz , CSP, Copper wound Distribution Transformer with CRGO/Amorphous core generally conforming to IS-2026/1977 (latest version) except where specified otherwise with first filling of oil generally as per IS-335/1983 (latest version) and as per specification.
Losses : No Load : 40 W (Max.)
Full Load : 245 W (Max.)
Download
SPMPT-77/10-11 18-OCT-2011 16-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
Tong Testers
(Static) Digital,
Download
SPMPT-76/10-11 18-OCT-2011 16-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
Insulation Testers
i) 2.5KV Meggers
ii) 1000V Meggers
iii) Earth Meggers
Download
SPMPT-65/10-11 18-OCT-2011 24-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
a)New Insulating Transformer oil manufactured from indigenous crude base TOBS/TOFS with characteristic values as Mentioned in Annexure-I, packed in 200/210 litres capacity in new non-returnable steel drums properly sealed.
And/or
b)New Insulating Transformer oil manufactured from imported crude base with characteristic values as mentioned in Annexure-I, packed in 200/210 litres Capacity in new non-returnable steel drums Properly sealed.
Download
SPMPT-64/10-11 18-OCT-2011 24-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
24V/40AH Batteries without chargers Download
SPMPT-63/10-11 18-OCT-2011 24-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
24V 40AH Batteries with Trickle Charger Download
SPMPT-55/10-11 17-OCT-2011 19-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
G.I Earth Pipe 40mm internal dia, 3mm pipe thickness and 2.5 meters long of standard quality class-B. The pipe should be provided with 10mm holes in diagonally opposite directions through out the length of the pipe at 150mm intervals center to center. At one end, cast iron cone of 50mm length shall be welded as shown in the sketch. The other end 40x3 mm G.I Flat of 340mm (150+40+150mm) length is to be welded neatly and the welding portion only to be painted to prevent rusting 4 Nos. holes suitable for 12mm bolts shall be drilled in the flat at equal distances and 4 Nos. G.I bolts and nuts of size 50x12mm with 2 Nos. sprint washers for each bolt shall be supplied with each pipe. G.I pipe shall conforming to Class-B and as per IS-1239 as per drawing enclosed (Part-I) 1990 with ISI marking. Download
SPMPT-54/10-11 18-OCT-2011 19-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
C.I Earth Pipes as per IS-1536/1976 Clause-A, 80mm Bore 2.54 meters long with flange at one end and cone at other end. The flange should be drilled with 4 Nos. 16mm dia holes and pipe body should be provided with 14 Nos. 12mm dia holes at equal distance with bolts and nuts Download
SPMPT-53/10-11 18-OCT-2011 23-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
LT Single phase 3 wire cross arms made out of M.S. angle 50x50x6mm with back clamps made out of MS Flat 50 x6mm as per the drawing enclosed and painted with single coat of best quality red oxide paint (suitable for 8M PSCC Poles)
Weight of the each set : 4.2+0.924=5.124Kgs
Download
SPMPT-52/10-11 18-OCT-2011 23-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
11KV top fittings with clamps made out of (ISMC-100) M.S. Channel 100x50mm, M.S. Flat 50x6mm and M.S. Angle 65x65x6mm suitable for 8.0 M PSCC Poles and for 11KV Pin insulators as per the drawing enclosed and painted with a single coat of best quality red oxide paint.
Weight of the each set : 4.4Kgs
Download
SPMPT-48/10-11 18-OCT-2011 23-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
11KV V-cross arms with back clamps suitable for 9.1M PSCC Poles made out of IS MC-75 M.S. Channel 75x40mm and M.S. Flat 50x6mm as per the drawing enclosed and painted with single coat of best quality red oxide paint
Weight of the each set : 9.0+1.23=10.23Kgs.
Download
SPMPT-49/10-11 18-OCT-2011 23-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
11KV V Channel cross arms with back clamps suitable for 8M PSCC Poles made out of IS MC-75 M.S. Channel 75x40mm and M.S. Flat 50x6mm as per the drawing enclosed and painted with single coat of red oxide paint of best quality
Weight of the each set : 9+0.924=9.924Kgs.
Download
SPMPT-47/10-11 18-OCT-2011 23-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
11KV V Channel cross arms with back clamps suitable for 8M PSCC Poles made out of IS MC-75 M.S. Channel 75x40mm and M.S. Flat 50x6mm as per the drawing enclosed and painted with single coat of red oxide paint of best quality
Weight of the each set : 9+0.924=9.924Kgs
Download
SPMPT-58/10-11 17-OCT-2011 16-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
11KV/433 –250V 25 KVA oil immersed naturally cooled three phase, 50 Hz double wound, CRGO Core/Amorphous Aluminum Winding, outdoor type, conventional Distribution Transformers top cover fixed with nut and bolt and neoprene gasket continuous arrangement generally conforming to IS-1180/Part-I&II and IS-2026/1977 latest versions except where specified otherwise with first filling of oil generally as per IS-335/1983 (latest version) and as per specification.
Maximum Losses at 50% Load: 210 W
Maximum Losses at 100% Load: 695 W
With BEE 3 star rating specification

AMENDMENT  issued for download Clickhere

Download
SPMPT-58A/10-11 17-OCT-2011 16-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI

11KV/433 –250V 25 KVA oil immersed naturally cooled three phase, 50 Hz double wound, CRGO Core/Amorphous Aluminum Winding, outdoor type, conventional Distribution Transformers top cover fixed with nut and bolt and neoprene gasket continuous arrangement generally conforming to IS-1180/Part-I&II and IS-2026/1977 latest versions except where specified otherwise with first filling of oil generally as per IS-335/1983 (latest version) and as per specification.
Maximum Losses at 50% Load: 175 W
Maximum Losses at 100% Load: 595 W
With BEE 5 star rating specification

AMENDMENT  issued for download Clickhere

Download
SPMPT-75/10-11 15-OCT-2011 22-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
9KV, 5KA Porcelain Lightning Arrestors
( Line Type)
2000Nos.
Download
SPMPT-73/10-11 15-OCT-2011 22-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
Hardware for LT. Shackle Insulators: Comprising of A pair of M.S. straps 2 Nos. M.S. Bolts with Hexagonal heads and Nuts 2 Nos. spring washers – Type (1) as per Fig. (3) of IS-7935-1975 suitable for shackle insulators type (1) of IS-1445-1977.

Hardware and Nuts to be used with the Hardware for LT shackle Insulators shall be as per IS-3063-1972 and IS-1363 of 1967 respectively. The weight of the complete set shall be 510 grams with 25 grams tolerance.
(All parts shall be Hot dip galvanized)
Download
SPMPT-72/10-11 15-OCT-2011 22-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
Hardware G.I Pins with spring washers and Nuts for LT Pin Insulators : Conforming to IS1363-Part-1967 and as per IS-3063-1972 (latest version thereof) with dimensions as per Fig. 2 of ISS-17935/1975 The shank length shall be 125mm Minimum failing load 2KN weight- 400gms Download
SPMPT-71/10-11 15-OCT-2011 17-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
H.T Guy Insulators conforming to figure – 3 designation 3 in Table – 1 of IS 5300/1969 or the latest version. Download
SPMPT-70/10-11 15-OCT-2011 17-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
11KV Solid core insulators with top and bottom metal fittings with 26mm threading and generally as per designation C6-75 (vide table No. 1 of IS-5350 part-II/1973) but conforming to the drawing enclosed and IS-2544/1973 in all respects suitable for 11KV 200Amps (tilting type) AB switches with minimum failing load of 6000N in upright bending test. The creepage distance shall not be less than 230 mm. Download
SPMPT- 69/10-11 15-OCT-2011 17-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
11KV Post type insulators of designation PA 75 (vide test of IS-5350 part-III/1971 and IS-2544/1973 (the latest issue thereof) in all respects and suitable for 11KV 400A & 800A (conventional type) AB switches with minimum failing load of 5000 N in upright bending test, 3000N in inverted bending test, 15000 N in tension, 200N-in torsion and 3000 N in compression. The creepage distance shall the 200mm Download
SPMPT- 67/10-11 15-OCT-2011 11-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
Single Core 1100 V Grade Weather Proof PVC Insulated and PVC Sheathed Aluminium Cables for Outdoor Service Connection Manufactured as per IS:1554 (Part-I)/ 1976, IS:8130/1984 and IS:5831/ 1984 for 150Sqmm Download
SPMPT- 66/10-11 15-OCT-2011 11-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
Single Core 1100 V Grade Weather Proof PVC Insulated and PVC Sheathed Aluminium Cables for Outdoor Service Connection Manufactured as per IS:1554 (Part-I)/ 1976, IS:8130/1984 and IS:5831/ 1984 for 120Sqmm Download
SPMPT-78/ 2011-12 15-OCT-2011 15-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
Audit for IT Systems & Infrastructure, related softwares for APSPDCL Download
SPWT NO .21 /2011-12 13-OCT-2011 25-OCT-2011 CHIEF GENERAL MANAGER /OPN
APSPDCL/TIRUPATI

Construction of Training Centre Building in the premises of Vidyuth Bhavan, Nellore in Nellore Circle.

Correngium  issued for download Clickhere

Download
SPWT NO .22 /2011-12 13-OCT-2011 25-OCT-2011 CHIEF GENERAL MANAGER /OPN
APSPDCL/TIRUPATI
Construction of Office Complex Building for Division Office, ERO, Sub-Division and Section Offices at Rajampet in kadapa Circle. Download
SPMPT-74/ 2011-12 10-OCT-2011 09-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
Porcelain L.T Shackle insulators (brown glazed) size 90X75 mm for use in L.T.lines below 1000 volts fully conforming to IS:1445 – 1977(with the latest amendments) Download
SPMPT-68/ 2011-12 10-OCT-2011 24-OCT-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
55Sq.mm Nominal Aluminium area 7/3.15mm Aluminium Alloy Standard Conductor, conforming to REC specification 33/84 (R-1991) and IS-398 Part-IV 1994 with latest amendments thereof Download
SPMPT-62/ 2011-12 10-OCT-2011 24-OCT-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
Super enameled with Terephathalate polyester base round copper wires (with thick covering) conforming to IS-4800 (Part-V) 1968 and IS-4800 (Part-III) 1968 suitable for winding of various capacities of Distribution transformers
1) SE Copper Winding Wire 25SWG
Download
SPMPT-61/ 2011-12 10-OCT-2011 24-OCT-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
0.7MM/22SWG Super enameled with Terephathalate polyester base round copper wires (with thick covering) conforming to IS-4800 (Part-V) 1968 and IS-4800 (Part-III) 1968 suitable for winding of various capacities of Distribution transformers Download
SPMPT-60/ 2011-12 10-OCT-2011 24-OCT-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
1.6mm Double paper covered round aluminium wires REC grade conforming to IS:6162 (Part-I) 1971 with its latest version suitable for windings of Distribution Transformers Download
SPMPT-51/ 2011-12 10-OCT-2011 11-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
ISLC 75 M.S. Channel 75X40mm confirming to IS2062 grade A
(with latest amendment if any)
(Weight per Meter 5.7Kgs & Sectional area 7.26Sq.cm)
AMENDMENT  issued for download Clickhere
Download
SPMPT-50/ 2011-12 10-OCT-2011 11-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
ISLC 100 M.S. Channel 100X50mm
Confirming to IS 2062 grade A
( with latest amendment if any) (Weight per Meter 7.9Kgs & Sectional area 10.02Sq.cm)
AMENDMENT  issued for download Clickhere
Download
SPMPT-46/ 2011-12 10-OCT-2011 09-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI

G.I. Wire 4.0mm (8SWG) as per ISS 280/1978
with latest amendment thereof. The Galvanization shall be as per IS 4826/79
( Latest version) in bundles of 10Kgs. each

TENDER POSTPHONE Clickhere

AMENDMENT  issued for download Clickhere

AMENDMENT  issued for download Clickhere

Download
SPMPT-45/ 2011-12 10-OCT-2011 09-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
7/2.5mm(7/12SWG)Galvanized Steel Wire as per IS 2141-1979 or the latest issue (70 Kgf/Sq.mm Quality) with Galvanization confirming to IS-4826/79 (latest version)AMENDMENT  issued for download Clickhere Download
SPMPT-44/ 2011-12 10-OCT-2011 09-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
7/3.15 mm (7/10SWG
Galvanized Steel Wire as per IS 2141-1979 or the latest issue (70Kgf/Sq.mm Quality) with Galvanization confirming to IS-4826/79 (latest version)
Download
SPMPT-43/ 2011-12 10-OCT-2011 11-NOV-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI

R.S. Joists of size 175x85mm(11Mtrs.Long) as per IS:2062 Grade ‘A’

TENDER POSTPHONE Clickhere

AMENDMENT  issued for download Clickhere

Download
SPMPT-42 / 2011-12 24-SEP-2011 14-OCT-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
 
Comprehensive Annual Maintenance Contract for Servers, Desktops & Printers for entire Discom Download
SPMPT-41/2011-12 20-SEP-2011 11-OCT-2011 CHIEF GENERAL MANAGER (P&MM)
APSPDCL/TIRUPATI
 

Supply and installation of additional SAN storage for SAP & Billing server at Corporate Office/ Tirupati

Postpane for details Clickhere

* General Terms & Conditions... Clickhere

Download
CGM/PROJECTS/ APSPDCL/ DC-56/ 2011-12 02-SEP-2011 27-SEP-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Supply, erection and commissioning of street lights (S.V.Lamps) with infrastructure in all habitations of all the Grampanchayats of all the six mandals in Pileru assembly constituency in Chittoor District on Turn-Key basis.AMENDMENT  issued for download Clickhere Download
SPWT-9/11-12 18-JUL-2011 28-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

Construction of Division Office , ERO & Sub-DivisionOffice building at Kandukur in Ongole Circle.

CORRIGENDUM issued for download Clickhere

Download
SPMPT-11/11-12 18-JUL-2011 28-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 9.10M/280Kgs PSCC poles to Vijayawada Circle  Download
SPMPT-10/11-12 18-JUL-2011 28-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 8.0M/200Kgs PSCC poles to Vijayawada Circle  Download
SPMPT-19/11-12 18-JUL-2011 01-AUG-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 8.0M/140Kgs PSCC poles to Tirupati Circle  CORRIGENDUM issued for download Clickhere Download
SPMPT-16/11-12 18-JUL-2011 30-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 9.10M/280Kgs PSCC poles to Ongole Circle  Download
SPMPT-15/11-12 18-JUL-2011 30-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 8.0M/140Kgs PSCC poles to Ongole Circle  Download
SPMPT-14/11-12 18-JUL-2011 30-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 8.0M/200Kgs PSCC poles to Ongole Circle  Download
SPMPT-18/11-12 18-JUL-2011 01-AUG-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 9.10M/280Kgs PSCC poles to Nellore Circle  Download
SPMPT-17/11-12 18-JUL-2011 01-AUG-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 8.0M/200Kgs PSCC poles to Nellore Circle  Download
SPMPT-20/11-12 18-JUL-2011 01-AUG-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 8.0M/140Kgs PSCC poles to Kadapa Circle  Download
SPMPT-13/11-12 18-JUL-2011 29-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 9.10M/280Kgs PSCC poles to Guntur Circle  Download
SPMPT-12/11-12 18-JUL-2011 29-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Manufacture & Supply of 8.0M/200Kgs PSCC poles to Guntur Circle  Download
SPMPT-22/11-12 14-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

H.V. BRASS BUSHING RODS FOR DTRS

AMENDMENT issued for download Clickhere

Download
SPMPT-21/11-12 14-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
LV Brass Bushing Rods suitable for conventional type Distribution Transformers with 12mm dia ,180mm length Brass rods having threads up to 50 mm on either side with 4 nuts , 6mm thick one Brass Gland 42mm outer dia , 4mm thick two top end washers 32mm dia , 4mm thick and one rubber oil seal completeAMENDMENT issued for download Clickhere Download
SPMPT-20/11-12 14-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

LV Brass Bushing Rods suitable for CSP type Distribution Transformers with 12mm dia and 160mm length, threading up to 25mm length on one side and 65mm length on other side with 3 Nos., Hexagonal brass nuts of dia 8/6 mm with one No. Brass Gland of thickness 14mm and of 25mm dia with 2 rubber oil seals and one brass washer of 4mm thick and 32mm dia complete.

AMENDMENT issued for download Clickhere

Download
SPMPT-19/11-12 14-JUL-2011 08-AUG-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
H.T. & L.T. Bi-Metallic Terminal Connectors suitable for Distribution Transformers as per the relevant ISI with latest amendments. AMENDMENT issued for download Clickhere Download
SIP-55/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Mydukur-II Division in Kadapa District (33/11KV Sub-Stations viz., Annavaram, Duvvuru & Mydukuru) Download
SIP-54/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Mydukur-I Division in Kadapa District (33/11KV Sub-Stations viz., Porumamilla, Kalavakatta, AKR Palli, Tekurupeta, B.Koduru, Payalakunta, Narasapuram, Varikuntla, K.N.Kottala, Kalasapadu, Y.Ramapuram, Amagampalli, B.Mattam, T.C.Palli, D.Agarharam, Konduru, Badvel, Venkatasettypalli, P.P.Kunta & Ganugapenta) Download
SIP-53/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Rajampeta-VI Division in Kadapa District (33/11KV Sub-Stations viz., Rajampeta, Bramhanpalli, Akepadu, Vathalur, Bavikadpalli, Reddipalli, P.V.Palli, Bestapalli, Penagaluru, Konduru, T.G.Palli, P.G.V.Palli, V.R.Palli, Koduru SS, Jangitivaripalli, Nagavaram, Kadiyalapalli, Koralakunta, Y.Kota, Gadela, V.P.R.KANDRIGA, Settigunta, Vontimitta, Mantapampalli, Limgampalli & Nandaluru) Download
SIP-52/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Proddatur-IV Division in Kadapa District (33/11KV Sub-Stations viz., JAMMALAMADUGU, Ambavaram, T.Chowduru, Dhanavulapadu, Thallaproddatur, V.Koduru, Kondapuram, Pottipadu, Burujupalli, Muddanur, Mangapatnam, Torrivemula, Thala Manchipatnam, Dodium, Gundlakunta, Nemalla Dinne, D.Kalvatala, Uppaluru, Chilamakuru, Malepadu, China Danduluru, Kamalapuram, Pandhillapalli, Induluru, G.N.Palli, Valluru, Proddatur Town, Rajupalem, Vellala, Proddatur Rural & Kamanuru) Download
SIP-51/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Pulivendula-II Division in Kadapa District (33/11KV Sub-Stations viz., Velidandla, Parnapalli, M. Chintala, Chinna Kudala, Hirojipuram, Bonala, Lingala, Pulivendula, N.R. Palli, J.R.Palli, Ravulakolanu & S.Puram) Download
SIP-50/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Tirupati town & rural-IV Division in Chittoor District (33/11KV Sub-Stations viz., Pakala, Damalacheruvu, Agarala, Gangudupalli, Rangampeta, Achamma Agraharam, Vallivedu, Mangalampeta, Guravarajupalli, Maddinaynipalli & Panabakam) Download
SIP-49/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Puttur-V Division in Chittoor District (33/11KV Sub-Stations viz., Katikapalle, Chinnathayyur, SR Puram, E.Kuppam, M Kothur, Nagari, 132KV SS Puttur, Vadamalapeta, Vijaya Puram, Netteri, A.P.Gunta, V.Kuppam, Nagalapuram & Chinnapandur) Download
SIP-48/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Piler Division in Chittoor District (33/11KV Sub-Stations viz., Garnimitta, Piler, Gyarampalli, Nutanakalava, Medikurthi, Vayalpad, Talapula, Sivaramapuram, Guttapalem, Chinthaparthi, Cherlopalli, Kalakada, Kalikiri, Errakotapalli, Pallavolu, Amilepalli, Nagarimadugu, Gurramkonda & Kadirayacheruvu) Download
SIP-47/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Chittoor-VI Division in Chittoor District (33/11KV Sub-Stations viz., Kattakindapalli, Uppuvanka, Avalakonda & Polakala) Download
SIP-46/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Madanapalle-V Division in Chittoor District (33/11KV Sub-Stations viz., Mulakalacheruvu, Mallela, Varikasuvupalli, B.Kothakota, V.R. Agraharam, Kandukuru, Bommanacheruvu, Kurabalakota, Valasapalli, CTM, PTM SS , Kotavooru, Burakayalakota, Bhakara Peta, V.R.Agraharam, Gopidinne & Kotavuru) Download
SIP-45/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Atmakur Division in Nellore District (33/11KV Sub-Stations viz., D.C.Palli, Kethigunta, Marripadu, Krishnapuram, Chinamachanuru, V.K.Padu, Peddireddypalli & Timmareddypalli) Download
SIP-44/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Kavali Division in Nellore District (33/11KV Sub-Stations viz., Kaligiri, Ayyapareddypalem, Ananthapuram, Jaladanki, Bramhanakraka, Chowdavaram, Vinjamur, Chakalikonda, Gudemadakala, Motuchintalapalem, Kondapuram, Gottigundala, Maddurpadu, PR Nagar, Bogole, Sangam, Siddipuram, Dagadarthi, Ithampadu & Patur) Download
SIP-43/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Naidupeta-I Division in Nellore District (33/11KV Sub-Stations viz., Menakuru, Annamedu, Puduru, Pellakuru, K.G Kandriga, Ozili, Kurugunda, Aaemenipadu, Vajjavaripalem, Mannarpoluru, Dakkili, Mopuru, Daggavolu & Pigilam) Download
SIP-42/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Gudur-I Division in Nellore District (33/11KV Sub-Stations viz., Goginenipuram, Mittatmakuru, Gollapalli, Chinthavaram, Chillakuru, Cherlopalli, Utukuru Sydapuram, Pothegunta, Rapuru, Gonupalli, Chendodu) Download
SIP-41/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Nellore-I Division in Nellore District (33/11KV Sub-Stations viz., 132KV N V Garden, Market Yard, Podalakur, Viruvur, Thatiparthy, P G Patnam, Adurpalli, Chejerla, CH Atmakur & Thurpupalli) Download
SIP-40/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Markapur-II Division in Prakasam District (33/11KV Sub-Stations viz., Yachavaram, Komarolu, Racherla, P.Araveedu, Sanikavaram, B. Cherlopalli , Mekalavaripalli & Mutukula) Download
SIP-39/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Markapur-I Division in Prakasam District (33/11KV Sub-Stations viz., SR Peta, KS Palli, Akkapalli, Pedadornala, Chapalamadugu, Y.Palem, Tripuranthakam & P.Cheruvu) Download
SIP-38/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Kanigiri-II Division in Prakasam District (33/11KV Sub-Stations viz., Darsi, Marripudi, Kanigiri, Pamur, P.Irlapadu & C.S.Puram) Download
SIP-37/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High Voltage Distribution System in Kanigiri-I Division in Prakasam District (33/11KV Sub-Stations viz., Donakonda, Kurichedu, Talluru, Podili, Mundlamur, T.R.Palli & Rallapalli) Download
SIP-36/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into Highvoltage Distribution System in Macherla-I Division in Guntur District (33/11KV Sub-Stations viz., Bellamkonda, Machavaram, Macherla, Gurazala, Durgi, Muthukuru, Koppanuru, Nakarikallu & Atchempet) Download
SIP-35/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into Highvoltage Distribution System in Narasaraopet Division in Guntur District (33/11KV Sub-Stations viz., Enugupalem, Cheekateegalavaripalem, Nuzendla, Remidecherla, Bandalamotu, Gandiganumala, Veellaturu, Pamidipadu, Epuru, Krosuru, Pisapadu, Sattenapalli SS-II, Dullipalla SS-I, arasaraopet, Uuppalapadu & Rompicharla) Download
SIP-34/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into Highvoltage Distribution System in Nuzividu-II Division in Krishna District (33/11KV Sub-Stations viz., Gudipadu, Agiripalli, A.Nekkalem, Nandamuru, Telaprolu, Veeravalli & Pallerlamudi) Download
SIP-33/ 2011-12 05-JUL-2011 25-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Conversion of LT Network into High voltage Distribution System in Nuzividu-I Division in Krishna District (33/11KV Sub-Stations viz., Musunuru, Venkatapuram, Nuzvid, Katrenipadu, Annavaram & Vattigudipadu) Download
SIP-32/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at Nerabylu (V) in Y.V.Palem Mandal in Piler Operation Division in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-31/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at Paturu in Rajampeta Operation Division in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-30/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 1No. 33/11 KV Sub-Station, connected 33 KV & 11 KV lines at 132KV SS compound (Puttur) in Puttur Operation Division and 33KV interlinking lines from 132KV SS Somala in Piler Operation Division in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-29/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 1No. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Venkateswarapuram in Nellore Operation Division in Nellore District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-24/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 3Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Sanipaya, Settipalli, Konampeta in Rayachoti Operation Division in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-23/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 3Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Govt.Hospital (Pulivendula), Peddajuturu, Mabbuchinthalapalli in Pulivendula Operation Division in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-22/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 3Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Ayyavaripalli, Naganurupalli, Buduguntapalli in Mydukur, Proddatur & Rajampeta Operation Divisions in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-21/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 3Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at T.Kammapalli, Rollamadugu, Mannur in Rajampeta Operation Division in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-20/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 4 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Madapur, Telugu Ganga Colony (Mydukuru), Adi Reddy Palli, Uppagunta palli in Mydukur Operation Division in Kadapa District on turnkey basis (excluding 100Sqmm Conductor) Download
SIP-19/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 3 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Gorlapalli, Katimayakunta, Boreddyvaripalli in Kadapa & Rayachoti Operation Divisions in Kadapa District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-18/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 3 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at A.Buduguru, C.Baladar, MNR Palli in Kuppam & Chittoor Rural Operation Divisions in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-17/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 2 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Palem, ITI College(Piler) in Piler Operation Division in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-16/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 2 Nos. 33/11 KV Sub-Stations, connected 33 KV & 11 KV lines at Kollagunta, Kothakota in Puttur & Chittoor town Operation Divisions in Chittoor District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-10/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 4 Nos. 33/11 KV Sub- Stations, connected 33 KV & 11 KV lines at Padarupalli, Narayanareddypeta, N.M. Kandriga & Vanamthopu in Nellore District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-09/ 2011-12 29-JUN-2011 14-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 2 Nos. 33/11 KV sub stations, connected 33 KV & 11 KV lines at Kothuru & Guntupalli in Kanigiri Operation Division in Prakasam District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-08/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 2 Nos. 33/11 KV sub stations, connected 33 KV & 11 KV lines at Oguru & Chinalatripi in Kandukuru Operation Division in Prakasam District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-06/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 3 Nos. 33/11 KV sub stations, connected 33 KV & 11 KV lines at Anumalaveedu, Rajupalem & Nagulavaram in Markapur Operation Division in Prakasam District on turnkey basis (excluding 100 Sqmm Conductor) Download
SIP-03/ 2011-12 29-JUN-2011 20-JUL-2011 CHIEF GENERAL MANAGER /PROJECTS
APSPDCL/TIRUPATI
Erection and commissioning of 2 Nos. 33/11 KV sub stations, connected 33 KV & 11 KV lines at Julakallu & Pulipadu in Macherla Operation Division in Guntur District on turnkey basis (excluding 100 Sqmm Conductor) Download
SPMPT-39/11-12 25-JUN-2011 18-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV Solid core insulators for Three Phase 11KV H.G. Fuse Sets conform in all respects to IS 5350 and IS-731/1971(Latest Version)2nd AMENDMENT issued for download ClickhereAMENDMENT issued for download Clickhere Download
SPMPT-38/11-12 25-JUN-2011 18-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Hardware fittings for 11KV string insulators conforming to IS 2486 (the latest version) C&T Type consisting of
a) One set of cross straps suitable for 100X50mm channel cross arms as per fig. 26 of IS 2486 part-II-1974 and the dimensions of bolts head, nut and spring washer shall be as per IS 1363-1967 and IS 3063 – 1972 respectively.
b) One Tension clamp complete with clevis, flat washer 2.5mm split pin brass 4mm, 16mm rivet, keeper U bolt 10mm nut 8mm. And spring washer 2.5mm etc. All sundry items to make complete fittings should be included. The clamps should of aluminium alloy. The clamps should be suitable for fixing (34 Sq.mm & 55 Sq.mm AAA Conductor)AMENDMENT issued for download Clickhere
Download
SPMPT-37/11-12 25-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV G.I Pins: Hardware G.I Pins with spring washers and nuts for 11KV Pin Insulators: Conforming to IS 2486-Part-I-1971 and IS –2486-Part-II-1989 (Latest versions thereof) with dimensions as per Fig. (5) S165P of IS-2486-Part-II-1989 with specifications confirming to S165P . The shank length shall be 150 mm. Minimum failing load 5KN.AMENDMENT issued for download Clickhere Download
SPMPT-36/11-12 25-JUN-2011 18-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV 45 KN composite polymer insulators suitable to C&T clamps as per IEC Specification No. IEC 61109 and as per relevant IS.AMENDMENT issued for download Clickhere Download
SPMPT-35/11-12 25-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV Pin insulators (Porcelain) conforming to IS:731-1971 (the latest issues) with minimum failing load of 5KN and to suit the insulator pins conforming to fig. 5 ref. 5165P of IS:2486 - part-II-1974. The creepage distance shall be 230mm minimum.AMENDMENT issued for download Clickhere Download
SPMPT-34/11-12 25-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Metallic parts for 11KV 3f HG fuse sets complete comprising arcing horns, insulator supports, MS mounting suitable for single pole structure with required bolts and nuts along with 12KV solid core insulators for the above HG fuse sets ie., 3 Nos. per set with bird fault proof arrangement confirming to the technical particulars as per technical inspection.AMENDMENT issued for download Clickhere Download
SPMPT-33/11-12 25-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
34Sqmm AAA Conductor specifies 34Sq.mm Nominal Aluminium area 7/2.50mm Aluminium Alloy Stranded Conductor, conforming to REC specification 33/84 (R-1991) and IS-398 Part-IV 1994 with latest amendments thereofAMENDMENT issued for download Clickhere Download
SPMPT-32/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11 KV 3C x 35 Sq. mm Heat shrinkable end termination cable jointing kits (Out door type) suitable for XLPE UG cable with ISI markAMENDMENT issued for download Clickhere Download
SPMPT-31/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

Unarmoured PVC insulated and PVC sheathed 1100 Volts grade cables with stranded conductors of annealed high conductivity copper conforming to IS:1554 and IEC 228 of size.
4x2.5Sqmm

2nd AMENDMENT issued for download ClickhereAMENDMENT issued for download Clickhere

Download
SPMPT-30/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
L.T. AERIAL BUNCHED CABLES :
HDPE insulated aluminium cable twisted over a central bare aluminium alloy messenger wire for use on L.T. overhead lines conforming to IS 8130/1984, IS 6474/1984 and IS : 398 (iv) 1994 of the following size with latest amendment thereof
a) 2C X 16 + 25 Sq.mm
Download
SPMPT-29/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

Nylon Bush suitable for Moving Insulator arrangement of 11KV 200A Tilting Type AB Switches2nd AMENDMENT issued for download Clickhere

1st AMENDMENT issued for download Clickhere

Download
SPMPT-28/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Moving contact for 11KV 200A (16 KA Load Break) T.T. type AB.Switch consisting of Jaw cup of 220x70x2 mm with jumper pad of HDEC 30x6x100mm and Arcing horn of 5mm dia St.Steel rod to fix in jaw cup with studs and nuts and with St.Steel springs ( 2 Nos.).AMENDMENT issued for download Clickhere Download
SPMPT-27/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Moving contact HDEC(nife) electroplated with swivelling plate (HDEC), Arcing Horn 6mm dia MSHDG and Copper flexible jumper with required bolts & nuts for 11KV 200 A (Conv.) AB.Switch. Nife size 32x5x320mm, swivelling plate size 32x5x145mm and One No.Flexible Jumper of Size 25x3x360mm.AMENDMENT issued for download Clickhere Download
SPMPT-26/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Fixed Contacts consisting of 2 Nos. Self released Jaws type fixed contact 25x4x75mm Copper Strip tin plated suitable for 11KV 400A (Conv.) AB.Switches with 10 Nos. Cu Strips for each jaw (The contacts designed to carry current with current density 2A/Sq.mm and while carrying the rated continuous current the temp. rise does not increase beyond the value specified in IS i.e., 40 Degree C above ambient) and 2 sets of ST.Steel ( Non - Magnetic) springs each provided on either side of fixed contact blades so that smooth contact is made for making and breaking contact and MSHDG top and bottom housing, arcing horn of 6mm dia MSHDG with required bolts and nuts with jumper pad of size 32x6.5x200mm.AMENDMENT issued for download Clickhere Download
SPMPT-25/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Fixed Contacts suitable for 11KV 200A (T.T) A.B.Switches shall be of high grade copper and capable of carrying the short circuit current of 16 KA (Min.) and capable of carrying rated normal current of the switch continuously the contact shall be 30x6x225 mm copper flat nickle plated and with 14 SWG gauge Phospher bronze arcing horn suitable for the above switch.AMENDMENT issued for download Clickhere Download
SPMPT-24/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV 200A Load Break outdoor tilting type triple pole gang operated vertical mounted AB Switch with all accessories, solid core insulators and Brass Bush instead of Nylon Bush for assembly and operation with the following coordinated ratings conforming to REC specification No. 43 of 1987 and as per IS 1818/1972, IS 9920 parts I to IV (Latest version) and IS 9921 parts I to IV (Latest version). The solid core insulators shall be in accordance with IS:2544/1973 and IS 5350 (Part-II) of 1973 or the latest issue.AMENDMENT issued for download Clickhere Download
SPMPT-23/11-12 25-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV 200 Amps conventional AB Switches with post type insulators complete, outdoor type manually operated triple pole gang operated rotating type single break horizontally mounted isolators switch portion complete in all respects with locking arrangements both in OFF and ON position as per IS 1818/1972, IS 9920/parts I to IV (latest version) and IS 9921 part I to IV (latest versions) with one set of six rigid bimetallic connectors suitable for ACSR/AAAC conductor size 55/34Sqmm with post type insulators. The switch portion with the above description shall be supplied with lock and keys of standard make, 3 fixing guides and earth terminal with clamping bolt of 12mm. Dia for each phase marked with earth symbol and shall be with all accessories as per clause (6) & (7) of section- IV for assembly and operation and shall be with the following co-ordinated ratings.
a) Rated Voltage : 12 KV
b) Rated Current : 200 A
c) Rated short time Current : 16KA/1 Sec.
d) Rated peak short circuit current : 40KA (Peak)AMENDMENT issued for download Clickhere
Download
SPMPT-18/11-12 23-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV/433-250 V 315KVA oil immersed naturally cooled three phase 50Hz Outdoor type CSP Distribution Transformer, CRGO/ Amorphous, top cover fixed with nut and bolt and neoprene gasket arrangement with double paper covered copper wound winding with U shaped pressure relief vent of 0.025 Copper diaphragm generally conforming to IS 1180/Part I & II of 1979 and IS -2026/1977 latest versions except where specified otherwise with firms filling of oil generally as per IS-355/1983 (latest version ) and as per specification
Guaranteed Max Lossess :
No Load : 680W(Max) - for CRGO Core
185W (Max) - for Amorphous
Full Load : 3500 W (Max.)
AMENDMENT issued for download Clickhere
Download
SPMPT-17/11-12 23-JUN-2011 25-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
3Ø 40 KVA CRGO core Conventional type copper wound Distribution Transformers generally conforming to IS-1180(part-I) with latest versions except where specified otherwise with first filling of oil generally as per IS-335/ 1993 (latest version) and as per specification
Maximum Losses at 50% Load: 277 W
Maximum Losses at 100% Load: 914 W
With BEE 3 star rating specificationAMENDMENT issued for download Clickhere
Download
SPMPT –02/11-12 01-JUN-2011 06-JUN-2011 CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI Manufacture & Supply of 9.10M/280Kg PSCC Poles to Guntur CircleCORRIGENDUM issued for download Clickhere Download
SPMPT –03/11-12 01-JUN-2011 06-JUN-2011 CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI Manufacture & Supply of 8.0M/200Kg PSCC Poles to Nellore CircleCORRIGENDUM issued for download Clickhere Download
SPMPT –04/11-12 01-JUN-2011 07-JUN-2011 CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI Manufacture & Supply of 9.10M/280Kg PSCC Poles to Tirupati CircleCORRIGENDUM issued for download Clickhere Download
SPMPT –08/11-12 04-JUN-2011 08-JUN-2011 CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI Manufacture & Supply of 12.5M/350 Kg Spun Poles to all circles of APSPDCLCORRIGENDUM issued for download Clickhere Download
SPMPT –07/11-12 04-JUN-2011 08-JUN-2011 CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI Manufacture & Supply of 11.0M/350 Kgs SPUN Poles to all the Circles in SPDCL.CORRIGENDUM issued for download Clickhere Download
SPMPT-40/11-12 15-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

H.T. Meter Boxes AMENDMENT issued for download Clickhere

Amendment issued for downlaod Clickhere

Download
SPMPT-16/11-12 15-JUN-2011 18-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
 M.S. Bolts, Nuts & Washers of various sizes as per IS 1363 with latest amendments
5/8”x 3” ( Full Thread) 100,
5/8”x 4” ( Full Thread) 100,
5/8”x 6” ( Full Thread) 25AMENDMENT issued for download Clickhere
Download
SPMPT-15/11-12 15-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
M.S. Flat 50X6mm confirming to IS2062 grade A (with latest amendment if any) (weight per meter 2.4KgsAMENDMENT issued for download Clickhere Download
SPMPT-14/11-12 15-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
M.S. Flat 75X8mm confirming to IS2062 grade A (with latest amendment if any) (weight per meter 4.7Kgs)AMENDMENT issued for download Clickhere Download
SPMPT-13/11-12 15-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
ISA 50-50 M.S. Angle 50x50x6mm confirming to IS2062 grade A (with latest amendment if any) 4.5Kg Weight per Mt. & sectional area 5.68Sq.cm AMENDMENT issued for download Clickhere Download
SPMPT-12/11-12 15-JUN-2011 11-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

ISA 65-65
M.S. Angle 65x65x6mm confirming to IS 2062 grade A (with latest amendment if any) 5.8Kgs – Weight per Mt. & sectional area 7.44Sq.cm

AMENDMENT issued for download Clickhere

Download
SPMPT-04/11-12 13-JUN-2011 06-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Registers & Forms Download
SPMPT-05/11-12 13-JUN-2011 14-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
33KV Outdoor VCBs (Operated on 220Vdc) Download
SPMPT-06/11-12 13-JUN-2011 15-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
33KV CTs of ratio 150/1 Amp. Class 0.2S accuracy Download
SPMPT-07/11-12 13-JUN-2011 14-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
33KV/110V Single phase Potential transformers
of class 0.2 accuracy
Download
SPMPT-08/11-12 13-JUN-2011 15-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV CTs of ratio100/1A of class 0.2S accuracy Download
SPMPT-09/11-12 13-JUN-2011 15-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV CTs of ratio150/1A of class 0.2S accuracy Download
SPMPT-10/11-12 13-JUN-2011 14-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV 3Phase PTs of Class 0.2 accuracy Download
SPMPT-11/11-12 13-JUN-2011 15-JUL-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV Metering Sets of ratio 5/5A class 0.5S accuracy
(Out Door type)
Download
Spec. No. 2/ 2010-11 9-JUN-2011 24-JUN-2011 CHIEF GENERAL MANAGER /(HRD)
APSPDCL/TIRUPATI
Providing Technical Manpower Services (TMS) for a period of ONE (1) year at various locations of SPDCL (Krishna, Guntur, Prakasam, Nellore, Chittoor and Kadapa districts)

Amendment issued for downlaod Clickhere

Download
SPMPT-03/11-12 21-MAY-2011 26-JUN-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
LT CT Operated Trivector Meters with 4 Nos. CTs of ratio 125/5A and class 0.5 S accuracy housed in PP Box

Amendment issued for downlaod Clickhere

Download

SPMPT- 01/2011-2012

06-MAY-2011 25-MAY-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Single phase (10-60A) keypad pre payment meter and vending / transaction service

Amendment issued for downlaod Clickhere

Download
SPMPT- 02/2011-2012 06-MAY-2011 25-MAY-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

Three phase

(20-80A)  keypad pre payment meter and vending / transaction service

Amendment issued for downlaod Clickhere

Download
SPWT–13 /10-11 02-APR-2011 07-APR-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Construction of Division Office Building ,Mydukur in Kadapa Circle

Corrigendum issued

for download Clickhere

Download
SPMPT–94 /10-11 26-MAR-2011 18-APR-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV 45 KN composite polymer insulators suitable to C&T clamps as per IEC Specification No. IEC 61109 and as per relevant IS. Download
SPMPT–11 /10-11 24-MAR-2011 30-MAR-2011 CHIEF GENERAL MANAGER /OPERATION/ TIRUPATI Manufacture & Supply of 8.0M/200Kg PSCC Poles to Guntur Circle Download
SPMPT–93 /10-11 21-MAR-2011 18-APR-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

Supply, Erection and Commissioning

of 11kv 2 MVAR Capacitor Banks With associated equipments

*2nd Amendment issued for downlaod Clickhere

 

Amendment issued for downlaod Clickhere

Download

TENDER SPECIFICATION No.2,9,11,13,14,

15,16,17,18,19,

22,23,24,34,35,

37,41,44,45,53,54,

74,75,80,89,90,93,

94,96,100,101,102,

103,104,105,106,

107,108,110,120,122,

123,128,135,137,139,

143,144,145,149,150,

151,152,153,

155/2011-12

18-FEB-2011 22-MAR-2011 Superintending Engineer/Operation/ Kadapa

Carrying out Manning & Maintenance On work contract basis of the specified 33/11KV Sub-stations in Operation circle, Kadapa

Extension issued

for download Clickhere

 

 

 

Download
SPMPT–91 /10-11 14-MAR-2011 18-APR-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV/433 – 250V 16KVA oil immersed naturally cooled three phase, 50 Hz double wound, CRGO/ Amorphous core, Copper Winding, outdoor type, Conventional Distribution Transformers top cover fixed with nut and bolt and neoprene gasket continuous arrangement generally conforming to IS-1180/Part-I&II and IS-2026/1977 latest versions except where specified otherwise with first filling of oil generally as per IS-335/1983 (latest version) and as per specification. Maximum Losses at 50% Load: 150 W
Maximum Losses at 100% Load: 480 W
With BEE 3 star rating specification
Download
SPMPT–92 /10-11 11-MAR-2011 18-APR-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
ISLC 100 M.S. Channel 100X50mm confirming to IS 2062 grade A
( with latest amendment if any) (Weight per Meter 7.9Kgs & Sectional area 10.02Sq.cm)
ISLC 75
M.S. Channel 75X40mm confirming to IS2062 grade A (with latest amendment if any)
(Weight per Meter 5.7Kgs & Sectional area 7.26Sq.cm)
Download
SPMPT–90 /10-11 09-MAR-2011 07-APR-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
11KV metering sets of class 0.5S accuracy
10/5A(outdoor type)
Download

Spec. No. 6,20,21,36,39,42,

53,56,67,74,75,

78,84,98,101, 110 & 114 /10-11

02-MAR-2011 09-MAR-2011 SUPERINTENDING ENGINEER
OPERATION CIRCLE/ONGOLE
Carrying out of Operation & Maintenance of 33/11KV Sub-stations ( including watch & ward ) on work contract basis Download
SIP- 52/2011 24-FEB-2011

11-MAR-2011

Chief General Manager/Projects
Coporate office/ Tiurpati

Building up the infrastructure for the proposed Disaster Recovery Center of APDISCOMS in SPDCL Corporate Office, , Tirupati

 

Corrigendum issued

for download Clickhere

 

*Last date for submission of hard copies along with DD/BG towards Bid Security to reach the Employer

21-03-2011

Download
SPMPT–89 /10-11 15-FEB-2011 16-MAR-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI

11KV/433 – 250V 160 KVA oil immersed naturally cooled three phase, 50 Hz double wound, CRGO /Amorphous Core Aluminum Winding, outdoor type, CSP 3-star rated Distribution Transformers top cover fixed with nut and bolt and neoprene continuous gasket arrangement generally conforming to IS-1180/Part-I&II and IS-2026/1977 latest versions except where specified otherwise with first filling of oil generally as per IS-335/1983 (latest version)and as per specification.
Maximum Losses at 50% Load: 770 W
Maximum Losses at 100% Load: 2200 W
With BEE 3 star rating specification

*Extension issued for downlaod Clickhere

Download
SPMPT–86 /10-11 03-FEB-2011 05-MAR-2011 CHIEF GENERAL MANAGER /(P&MM)
APSPDCL/TIRUPATI
Three Phase
(10-60)a LT static whole current Trivector energy meters with
backlit LCD display

*3nd Amendment issued for downlaod Clickhere

2nd Amendment issued for downlaod Clickhere

Amendment issued for downlaod Clickhere

TECHNICAL SPECIFICATION AND GUARANTEED TECHNICAL PARTICULARS FOR SINGLE PHASE METERS

Download