Vision
: |
|
|
"To
Create an organization that is profitable, viable, responsive, serving
the needs of the customer, suppliers and employees" |
|
|
SPDCL is set to achieve this
vision through the following objectives: |
|
|
Mission: |
|
|
Commercial
Objectives : |
|
- Eliminating pilferage
of energy
- Reducing the
exceptional cases
- Reducing arrears
|
|
|
|
Operational Objectives: |
|
-
Minimizing Technical / Transmission Loses
-
Reducing transformer failures
-
Reducing O&M expenditure
-
Maintaining rolling stock of additional DTR s at every sub-station
level to avoid delays in replacing the failed units.
|
|
Social Objectives: |
|
-
Electrification of Dalithwadas
-
Electrification of Weaker section Colonies
-
Releasing of supply to PWS / RWS Schemes
-
Separation of 11 KV Feeders for Mandal Headquarters
|
|
Regulatory Objectives: |
|
- To function as per the
guidelines issued by APERC
- To Continuously
monitor the progress of various directives issued by APERC
|
|
APSPDCL has plans to improve the level of service with technical
excellence: |
|
-
As the
high voltage distribution system (HVDS) experimentally set up in
Chittoor district is giving good results, the model is being extended
in all districts.
-
GIS
based consumer indexing is being done.
-
Customer Service Centers and Electricity Call Centers functioning in
all urban areas and in all sub-division headquarters.
-
Spot
Billing for energy consumption is introduced throughout the company.
-
Rate of
DTR failures brought down from 21.25% in 2000-01, 14.16% in
2002-03, 9.27% in 2003-04, 8.45% in 2004-05, 9.19% in 2005-06 and
5.70% in 2006-07.
|