Do's

√Always, install safety equipments like Earth leakage / overload & short circuit protection (circuit breakers / switches ) near point of   supply.

√Ensure healthy ear thing is installed at your premises.
√Ensure only IS marked cables of proper capacity are used for your installation and get the wiring done through only licensed Electrical Contractors.
√Pay the energy bills regularly at SPDCL authorized E-Seva Collection Centers / Computerized collection centers and within due date to avoid  inconvenience due to disconnection.
√Use electricity only when needed, switch off the supply when not required.
√Always use proper capacity fuse wire in main switches.
√To got proper voltage, install adequate capacitors for inductive loads.
√Use only I. S. I marked electrical equipments.
√Ensure safety of energy meter and metering equipments in your premises. Provide weather Proof enclosures to meters and metering equipments
√For rectification of faults in your installations, call licensed electrical contractors only.
√For any difficulty related to electricity supply, always contact SPDCL authorities at their offices
√If energy meter provided is found stopped / faulty, please bring the facts to the notice of SPDCL authorities immediately.
√Apply for your service connection for Electricity in the prescribed form CSC.
√Enter all the particulars required in the application form.
√Produce proper documents/records to prove the legal ownership of the premises for which electricity supply is required. In case you area tenant, produce evidence for lawful occupation of the premises.
√Pay security deposit and service connection charges before the specified date to avoid cancellation of the application.
√Ensure that the licensed electrical wiring contractor or his authorized representative is present in your premises at the time of effecting supply for testing the installation and signing in the repot.
√Provide space for fixing the meter at a convenient place in the ground floor for easy accessibility to the Assessor for taking meter reading.
√In all storied buildings, irrespective of the number of floors, provide space for fixing meter, cut -out etc., in the ground floor only.
√While connecting additional loads like lights, fans, etc., and other electric appliances such as refrigerators, air-conditioners, Water-heaters etc., ensure that the meter capacity is adequate.
If the meter capacity is not adequate, contact the Section Officer for installing higher capacity meter.
√Use electricity only for purpose for which the service connection has been given (i.e. domestic).
√Safeguard the meter and other equipments of the SPDCL in your premises.
√Construct your building with proper clearance from the existing High Tension/Low Tension lines as per the Indian Electricity Rules
√If the building does not have adequate frontage and the line has to go through or over the adjoining premises of other owners arrange for necessary way-leave at your own cost for running the lines.
√Get your supply converted from single-phase to three –phase if the total connected load exceeds 4000 watts.
√Observe safety precautions to avoid electrical accidents.
√Replace promptly defective electrical fittings and appliances.
√Pay electricity consumption bills and additional security deposit promptly at authorized cash counters only.
√Pay the electricity consumption charges at the beginning of the month to avoid rush on the last date.
√Security deposit equivalent to three months, consumption should be available with the SPDCL If you  receive a notice of claim for additional security deposit, pay the same within the date to avoid
disconnection of your service connection.
√If your service connection has been disconnected for non-payment, you may pay the amount due and the reconnection charges and intimate the Section Officer/Inspector of Assessment and avail reconnection.
√If the meter is found to be defective and not running, bring the matter to the notice of the Section Officer in writing for replacement by a healthy meter.
√Get the internal wiring checked up periodically not only to avoid leakage of electricity but also to safeguard the lives of the inmates in the premises.
√ Near the point of supply safety equipments like earth leakage short circuit protection (Circuit breakers/ switches) must be in
√At your premises proper ear thing must be installed.
√When not required switch of the electricity supply.
√Use proper capacity fuse wire for main switches.
√For proper voltage, install adequate capacitors for inductive loads.
√  To avoid inconvenience due to disconnection, the energy regularly paid at SPDCL authorized CCC, e-Seva centers
√Through licensed electrical contractors cables of I S I mark capacity must be used for installation.
√Provide waterproof enclosures to meters and metering equipments and ensure their safety.
√Prefer only licensed electrical contractors for rectification of any problem.

√APSPDCL authorizes must be contracted for difficulties related power supply.

Dont's

XDo not connect multiple equipments to a single point outlet to avoid excess loading

XDo not use bare wires for extending supply from one point to other or from one premises to other premises. It is hazardous and causes accidents.

XAvoid loose connections and joints.

XAvoid theft of electrical energy, It is cognizable offence and attracts penal charges and / or imprisonment.

XDo not tamper with energy meters, meter seals or metering equipments, it is an offence.

XDo not pay your bill amounts to unauthorized persons. Pay only at SPDCL / Authorized cash collections center and obtain receipts.

XDo not plant trees below the overhead power lines.
XDo not meddle with live wires/points. It may cost your life.

XDon't get the wiring works done by unauthorized persons, which is an offence under the Indian Electricity Rules 1956.

XDon't use substandard wires and wiring accessories. Don't install fittings and appliances of poor quality.

XDon't give the application before completing the wiring in your premises.

XDon't hand over the application to the Board staff; don't send it by ordinary post.

XDon't delay to pay the security deposit and he service connection charges once the advice for payment is received.

XDon't construct your building underneath a High Tension or Low-Tension line without proper clearance.

XDon't shift the meter or meter board without proper sanction by SPDCL.